POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 53items · current page 1–53 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Blyth BESS Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW DC) 3.13 MWdc Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 Unit Capacity (MW AC) 3.13 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 Aggregated Nameplate Capacity (MW DC) 200.32 MWdc Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 Aggregated Nameplate Capacity (MW AC) 200.32 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 Agg Nameplate Storage Capacity (MWh) 400 MWh Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7
Detailed source fields Original source field Published value or condition Survey ID 2248 Site Name Blyth BESS KCI Id S00021 Site Owner Blyth Battery P/L as trustee for Blyth Battery Trust Region SA1 Max Site Capacity (AC) 200 Gen Info Unit ID 224801 Unit Name BLYTHWBT Technology Type Battery Storage Technology Detail Lithium-ion DUID BLYTHB1 Dispatch Type Scheduled Unit Count 64 Unit Capacity (MW DC) 3.13 Unit Capacity (MW AC) 3.13 Aggregated Nameplate Capacity (MW DC) 200.32 Aggregated Nameplate Capacity (MW AC) 200.32 Agg Nameplate Storage Capacity (MWh) 400 Commitment Status In Service Expected Closure Year 2044 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-03-30T15:25:13 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:130
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:56
Sources EV-98f0198bcc6a1ec0c3c5ae9a Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 6e02cb71e8ffcd7f6026562906690932cb6da14e9dc8e237bb2d27363ee6ecc7 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 2248 Site Name Blyth BESS KCI Id S00021 Site Owner Blyth Battery P/L as trustee for Blyth Battery Trust Region SA1 Max Site Capacity (AC) 200 Gen Info Unit ID 224801 Unit Name BLYTHWBT Technology Type Battery Storage Technology Detail Lithium-ion DUID BLYTHB1 Dispatch Type Scheduled Unit Count 64 Unit Capacity (MW DC) 3.13 Unit Capacity (MW AC) 3.13 Aggregated Nameplate Capacity (MW DC) 200.32 Aggregated Nameplate Capacity (MW AC) 200.32 Agg Nameplate Storage Capacity (MWh) 400 Commitment Status In Service Expected Closure Year 2044 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-03-30T15:25:13 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:130
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region SA1 AEMO Survey ID 2248 Gen Info Unit ID 224801 Site Name Blyth BESS DUID BLYTHB1 Commitment Status In Service Expected Closure Year 2044 Survey Latest Update Date 2026-03-30T15:25:13 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:56
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:56
Sources EV-98f0198bcc6a1ec0c3c5ae9a Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 6e02cb71e8ffcd7f6026562906690932cb6da14e9dc8e237bb2d27363ee6ecc7 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 193.984 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 193.984 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 193.984 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 193.984 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 193.984 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 193.984 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 193.984 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 193.984 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 193.984 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 200 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 400 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 193.984 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset