Australia · Generator · plant location

Mortlake Energy Hub

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Mortlake Energy Hub

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)5.72 MWdcOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-ff9cce5c2f7f1c4025ebb2bc
Unit Capacity (MW AC)4.39 MWacOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-ff9cce5c2f7f1c4025ebb2bc
Aggregated Nameplate Capacity (MW DC)434.72 MWdcOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-ff9cce5c2f7f1c4025ebb2bc
Aggregated Nameplate Capacity (MW AC)333.64 MWacOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-ff9cce5c2f7f1c4025ebb2bc
Detailed source fields
Original source fieldPublished value or condition
Survey ID2022
Site NameMortlake Energy Hub
KCI IdV00077
Site OwnerYanara Australia Pty Ltd
RegionVIC1
Max Site Capacity (AC)300
Gen Info Unit ID202202
Unit Name2
Technology TypeSolar PV
Technology DetailSingle Axis Tracking
Dispatch TypeSemi-scheduled
Unit Count76
Unit Capacity (MW DC)5.72
Unit Capacity (MW AC)4.39
Aggregated Nameplate Capacity (MW DC)434.72
Aggregated Nameplate Capacity (MW AC)333.64
Commitment StatusAnticipated
Full Commercial Use Date2028-08-30T00:00:00
Expected Closure Year2068
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-05-26T15:44:50
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textAnticipated
source_record_idGenerator Information:1015

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1015

Sources EV-ff9cce5c2f7f1c4025ebb2bc
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:468

Sources EV-2bd165e351dd13bb53d5bf7c
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 4967baa62f632ab1717cf339ede7863adaeb7e0522b0751a2fb3ba8f73bf72cd

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel