POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Mortlake Energy Hub Generator · Plan
Metric or condition Source value Basis, scope and stage Unit Capacity (MW DC) 5.72 MWdc Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc Unit Capacity (MW AC) 4.39 MWac Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc Aggregated Nameplate Capacity (MW DC) 434.72 MWdc Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc Aggregated Nameplate Capacity (MW AC) 333.64 MWac Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc
Detailed source fields Original source field Published value or condition Survey ID 2022 Site Name Mortlake Energy Hub KCI Id V00077 Site Owner Yanara Australia Pty Ltd Region VIC1 Max Site Capacity (AC) 300 Gen Info Unit ID 202202 Unit Name 2 Technology Type Solar PV Technology Detail Single Axis Tracking Dispatch Type Semi-scheduled Unit Count 76 Unit Capacity (MW DC) 5.72 Unit Capacity (MW AC) 4.39 Aggregated Nameplate Capacity (MW DC) 434.72 Aggregated Nameplate Capacity (MW AC) 333.64 Commitment Status Anticipated Full Commercial Use Date 2028-08-30T00:00:00 Expected Closure Year 2068 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-05-26T15:44:50 record_semantics participant_reported_generation_information_not_DC_supply Original text Anticipated source_record_id Generator Information:1015
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:468
Sources EV-2bd165e351dd13bb53d5bf7c Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 4967baa62f632ab1717cf339ede7863adaeb7e0522b0751a2fb3ba8f73bf72cd Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region VIC1 AEMO Survey ID 2022 Gen Info Unit ID 202202 Site Name Mortlake Energy Hub Commitment Status Anticipated Expected Closure Year 2068 Survey Latest Update Date 2026-05-26T15:44:50 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text Anticipated source_record_id Expected Closure Year:468
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:468
Sources EV-2bd165e351dd13bb53d5bf7c Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 4967baa62f632ab1717cf339ede7863adaeb7e0522b0751a2fb3ba8f73bf72cd Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 2022 Site Name Mortlake Energy Hub KCI Id V00077 Site Owner Yanara Australia Pty Ltd Region VIC1 Max Site Capacity (AC) 300 Gen Info Unit ID 202202 Unit Name 2 Technology Type Solar PV Technology Detail Single Axis Tracking Dispatch Type Semi-scheduled Unit Count 76 Unit Capacity (MW DC) 5.72 Unit Capacity (MW AC) 4.39 Aggregated Nameplate Capacity (MW DC) 434.72 Aggregated Nameplate Capacity (MW AC) 333.64 Commitment Status Anticipated Full Commercial Use Date 2028-08-30T00:00:00 Expected Closure Year 2068 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-05-26T15:44:50 record_semantics participant_reported_generation_information_not_DC_supply Original text Anticipated source_record_id Generator Information:1015
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 197.98 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 290 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 299.972 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-ff9cce5c2f7f1c4025ebb2bc 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1015
Sources EV-ff9cce5c2f7f1c4025ebb2bc Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4160193e2a44ac1962baca945adbc0a3f6ee75ae337ae25c5370b20bffe9007a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset