Australia · Generator · plant location

Upper Tumut

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Upper Tumut

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)82 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-a8a7ad0b5864db4a5a233442
Aggregated Nameplate Capacity (MW AC)82 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-a8a7ad0b5864db4a5a233442
Detailed source fields
Original source fieldPublished value or condition
Survey ID1217
Site NameUpper Tumut
Site OwnerSnowy Hydro Ltd
RegionNSW1
Max Site Capacity (AC)665
Gen Info Unit ID121703
Unit NameUpper Tumut:3
Technology TypeHydro
Technology DetailDam
DUIDUPPTUMUT
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)82
Aggregated Nameplate Capacity (MW AC)82
Commitment StatusIn Service
Expected Closure Year2070
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-05-19T16:30:51
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:1565

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1565

Sources EV-a8a7ad0b5864db4a5a233442
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 d87b638dadf354d9ba5306c7859894509744bb221174fd285a6599ccd92793e0

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:733

Sources EV-50cc280e9a593dca894db5d4
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 17afeb1bfd40fa11f56357e1f1e62ad97ea563a1d4e4e35470cea5b0d7b81091

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel