Upper Tumut
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Unit Capacity (MW AC) | 82 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-a8a7ad0b5864db4a5a233442 |
| Aggregated Nameplate Capacity (MW AC) | 82 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-a8a7ad0b5864db4a5a233442 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Survey ID | 1217 |
| Site Name | Upper Tumut |
| Site Owner | Snowy Hydro Ltd |
| Region | NSW1 |
| Max Site Capacity (AC) | 665 |
| Gen Info Unit ID | 121703 |
| Unit Name | Upper Tumut:3 |
| Technology Type | Hydro |
| Technology Detail | Dam |
| DUID | UPPTUMUT |
| Dispatch Type | Scheduled |
| Unit Count | 1 |
| Unit Capacity (MW AC) | 82 |
| Aggregated Nameplate Capacity (MW AC) | 82 |
| Commitment Status | In Service |
| Expected Closure Year | 2070 |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-05-19T16:30:51 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文状态 | In Service |
| source_record_id | Generator Information:1565 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 2条
数据来源 2026-07-31 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Generator Information:1565
依据 EV-a8a7ad0b5864db4a5a233442资料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 d87b638dadf354d9ba5306c7859894509744bb221174fd285a6599ccd92793e0
使用条件 AEMO general copyright permission subject to exceptions
数据来源 2026-07-24 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Expected Closure Year:733
依据 EV-50cc280e9a593dca894db5d4资料SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 17afeb1bfd40fa11f56357e1f1e62ad97ea563a1d4e4e35470cea5b0d7b81091
使用条件 AEMO general copyright permission subject to exceptions
