Australia · Generator · plant location

Upper Tumut

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Upper Tumut

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)82 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-66a968c9212955024aec1690
Aggregated Nameplate Capacity (MW AC)82 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-66a968c9212955024aec1690
Detailed source fields
Original source fieldPublished value or condition
Survey ID1217
Site NameUpper Tumut
Site OwnerSnowy Hydro Ltd
RegionNSW1
Max Site Capacity (AC)665
Gen Info Unit ID121701
Unit NameUpper Tumut:1
Technology TypeHydro
Technology DetailDam
DUIDUPPTUMUT
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)82
Aggregated Nameplate Capacity (MW AC)82
Commitment StatusIn Service
Expected Closure Year2070
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-05-19T16:30:51
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:1563

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1563

Sources EV-66a968c9212955024aec1690
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:731

Sources EV-3f26a68ace5523337a8f53ed
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 c0a6957fdce44e83d258ba1b198686f3a3f2a60e329ced3c2f3c804cf16bb82f

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel