POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Upper Tumut Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 82 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 Aggregated Nameplate Capacity (MW AC) 82 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690
Detailed source fields Original source field Published value or condition Survey ID 1217 Site Name Upper Tumut Site Owner Snowy Hydro Ltd Region NSW1 Max Site Capacity (AC) 665 Gen Info Unit ID 121701 Unit Name Upper Tumut:1 Technology Type Hydro Technology Detail Dam DUID UPPTUMUT Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 82 Aggregated Nameplate Capacity (MW AC) 82 Commitment Status In Service Expected Closure Year 2070 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-05-19T16:30:51 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:1563
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:731
Sources EV-3f26a68ace5523337a8f53ed Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 c0a6957fdce44e83d258ba1b198686f3a3f2a60e329ced3c2f3c804cf16bb82f Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1217 Site Name Upper Tumut Site Owner Snowy Hydro Ltd Region NSW1 Max Site Capacity (AC) 665 Gen Info Unit ID 121701 Unit Name Upper Tumut:1 Technology Type Hydro Technology Detail Dam DUID UPPTUMUT Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 82 Aggregated Nameplate Capacity (MW AC) 82 Commitment Status In Service Expected Closure Year 2070 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-05-19T16:30:51 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:1563
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region NSW1 AEMO Survey ID 1217 Gen Info Unit ID 121701 Site Name Upper Tumut DUID UPPTUMUT Commitment Status In Service Expected Closure Year 2070 Survey Latest Update Date 2026-05-19T16:30:51 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:731
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:731
Sources EV-3f26a68ace5523337a8f53ed Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 c0a6957fdce44e83d258ba1b198686f3a3f2a60e329ced3c2f3c804cf16bb82f Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 93 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 93 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 93 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 93 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 93 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 93 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 93 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 93 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 93 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 93 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 93 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 93 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 103 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 93 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-66a968c9212955024aec1690 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1563
Sources EV-66a968c9212955024aec1690 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f3d8ae029f2f89115b5d3d739346074db3ebadaea3c10b2e32bb7e4bc53c54fc Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset