Australia · Generator · plant location

Boco Rock Wind Farm

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Boco Rock Wind Farm

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)1.7 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380
Aggregated Nameplate Capacity (MW AC)98.6 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380
Detailed source fields
Original source fieldPublished value or condition
Survey ID1022
Site NameBoco Rock Wind Farm
Site OwnerTilt Renewables Australia Pty Ltd
RegionNSW1
Max Site Capacity (AC)113
Gen Info Unit ID102201
Unit NameBoco Rock Wind Farm:1-58
Technology TypeWind
Technology DetailOnshore
DUIDBOCORWF1
Dispatch TypeSemi-scheduled
Unit Count58
Unit Capacity (MW AC)1.7
Aggregated Nameplate Capacity (MW AC)98.6
Commitment StatusIn Service
Expected Closure Year2040
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-31T09:23:13
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:133

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:57

Sources EV-c4a37fb5be385d98941f9b7c
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 cb1b5ff663eefd322446a2ae5b97c957afe07abbdd4b77340ddbd2162b418aa2

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel