POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 33items · current page 1–33 · Source records, not unique facilities.

Power assets and projects · AUS · aemo_generation

Boco Rock Wind Farm

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)1.7 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380
Aggregated Nameplate Capacity (MW AC)98.6 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380
Detailed source fields
Original source fieldPublished value or condition
Survey ID1022
Site NameBoco Rock Wind Farm
Site OwnerTilt Renewables Australia Pty Ltd
RegionNSW1
Max Site Capacity (AC)113
Gen Info Unit ID102201
Unit NameBoco Rock Wind Farm:1-58
Technology TypeWind
Technology DetailOnshore
DUIDBOCORWF1
Dispatch TypeSemi-scheduled
Unit Count58
Unit Capacity (MW AC)1.7
Aggregated Nameplate Capacity (MW AC)98.6
Commitment StatusIn Service
Expected Closure Year2040
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-31T09:23:13
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:133

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:57

Sources EV-c4a37fb5be385d98941f9b7c
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 cb1b5ff663eefd322446a2ae5b97c957afe07abbdd4b77340ddbd2162b418aa2

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_closure

Boco Rock Wind Farm

Generation-register unit · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
RegionNSW1
AEMO Survey ID1022
Gen Info Unit ID102201
Site NameBoco Rock Wind Farm
DUIDBOCORWF1
Commitment StatusIn Service
Expected Closure Year2040
Survey Latest Update Date2026-03-31T09:23:13
Publication Date2024-07-24T00:00:00
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idExpected Closure Year:57

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:57

Sources EV-c4a37fb5be385d98941f9b7c
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 cb1b5ff663eefd322446a2ae5b97c957afe07abbdd4b77340ddbd2162b418aa2

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Survey ID1022
Site NameBoco Rock Wind Farm
Site OwnerTilt Renewables Australia Pty Ltd
RegionNSW1
Max Site Capacity (AC)113
Gen Info Unit ID102201
Unit NameBoco Rock Wind Farm:1-58
Technology TypeWind
Technology DetailOnshore
DUIDBOCORWF1
Dispatch TypeSemi-scheduled
Unit Count58
Unit Capacity (MW AC)1.7
Aggregated Nameplate Capacity (MW AC)98.6
Commitment StatusIn Service
Expected Closure Year2040
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-31T09:23:13
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:133

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Winter 2030

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Typical 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity90.48 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Peak 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity90.48 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Peak 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity90.48 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Peak 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Winter 2028

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Typical 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity90.48 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Peak 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Typical 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity90.48 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Peak 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Winter 2033

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Typical 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Winter 2029

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity90.48 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Peak 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Typical 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity90.48 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Peak 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Winter 2032

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity90.48 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Peak 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Winter 2026

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Winter 2031

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Typical 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity90.48 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Peak 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity90.48 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Peak 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Typical 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Typical 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Winter 2027

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Winter 2034

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Winter 2035

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Typical 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Boco Rock Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity98.6 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-8c81ee9a8667a3ab315a1380

측정·전망기간 Summer Typical 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:133

Sources EV-8c81ee9a8667a3ab315a1380
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b5adfefab74184353a4692ed63e7567613c04aaf8d1402ced42ccb0d35eb85bb

Usage terms AEMO general copyright permission subject to exceptions

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel