South Korea · Announced development projects

Solaseado AI Data Center

Development announcement · verify each phase

Project stage · source basis
Stage requires verification · 제안 단계
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
Not stated
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Metrics, specifications and scope

IndicatorsSource valueBasis, scope and stagePeriod and evidence
capacity unspecified40 MWunspecified · Project · proposedNot stated
Evidence for this value
project status제안 단계Published statement · Project · proposed not securedNot stated
Evidence for this value
planned useAI 및 HPC 컴퓨팅Published statement · Project · proposed not securedNot stated
Evidence for this value
power plan확장 가능한 공급 인프라 및 재생에너지 연계 구상Published statement · Project · proposed not securedNot stated
Evidence for this value
connectivity plan통신망 및 유틸리티 인프라 구축 구상Published statement · Project · proposed not securedNot stated
Evidence for this value
capacity basis note40MW는 IT부하·수전·확보전력 중 어느 기준인지 미공개Published statement · Project · proposed not securedNot stated
Evidence for this value

Sources and terms of use


Source terms of use

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel