GLOBAL EVIDENCE COMPARISON

Global facility evidence comparison

Select up to three records from the map list to compare published values on the same basis.

Item용인 덕성리 IDC
CountrySouth Korea
Data TypeAnnounced development projects
Reported operatorCheck each original source
Review statusDevelopment announcement · verify each phase
Data Reference DateNot stated
Collection review date2026-10-05
IT capacityMW · IT · Project · as published

56 MW
Not stated
Evidence for this value

PUEratio · Design · Project · Design

1.33 ratio
Not stated
Evidence for this value

site aream2 · site area · Project · Undisclosed

46545 m2
Not stated
Evidence for this value

Gross floor aream2 · gross floor area · Project · Undisclosed

57971 m2
Not stated
Evidence for this value

delivery roletext · Published statement · Project · announced not independently verified

자체 개발; 설계; 엔지니어링; 착공 전 업무; PM
Not stated
Evidence for this value

cooling technologytext · Published statement · Project · announced not independently verified

공기냉각 및 액체냉각 지원 계획
Not stated
Evidence for this value

construction start announcedtext · Published statement · Project · announced not independently verified

2025-09
Not stated
Evidence for this value

completion targettext · Published statement · Project · announced not independently verified

2028-Q2
Not stated
Evidence for this value

tenant evidence statustext · Published statement · Project · announced not independently verified

글로벌 CSP LOI 및 통신사 LOC 확보 주장; 임대차계약 체결과 구분
Not stated
Evidence for this value

Only values with matching asset type, metric, unit, basis, scope, stage and period share a row. Generation, utility intake, IT, contracted and available capacities are not added or converted. Empty cells do not mean equipment is absent.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel