KOREA DATA CENTER DATABASE
Explore Korean data center locations and status.
Search by region, operator, and project stage, and switch between the list and map to check facility specifications and sources. Be sure to review the scope and timing of the publicly available data.
Latest facility record check 2026-10-29 · The verification date for each individual record is indicated in the details. The number of registered entries does not represent the total market size nationwide.
Looking for a center that meets your needs?
Tell us your preferred location, power requirement and timing so we can outline the facility conditions to check.
You can submit an initial inquiry without signing up.Saved regions and filters
Save up to 20 region, operator and project-stage filters to revisit current listings.
Loading saved filters…
Reopen current listings with saved filters. No email alerts are sent.
Official specification evidence 93records · latest check 2026-10-14. The listing of specifications does not imply verification of remaining capacity or the validity of certifications.
Centers by operator · 57entities
Current Search Results: Project Stage and Regional Distribution
These are registered sites that match your current search criteria.
This is distinct from overall market share nationwide.
국가기상슈퍼컴퓨터센터
Korea Meteorological Administration
충청북도 청주시 청원구 오창읍 중심상업2로72
- Public Power
- 수전·시설전력: power_input: 14000 kW (국가기상슈퍼컴퓨터센터 공개 설비표) · IT Load: 5호기 소비전력6,354kW (시설 정격 IT Load와 구분) · UPS: ups_capacity: 13500 kVA (국가기상슈퍼컴퓨터센터 공개 설비표) · 비상발전: backup_power: 10750 kW (국가기상슈퍼컴퓨터센터 공개 설비표)
- Size & facility
- 대지: 23,092㎡ · 연면적·건물: 8,465.8㎡ · 전산실·코로케이션: 5호기 상면780㎡ (센터 전체 상면 아님)
Find a center and continue your review.