KOREA DATA CENTER DATABASE

Explore Korean data center locations and status.

Search by region, operator, and project stage, and switch between the list and map to check facility specifications and sources. Be sure to review the scope and timing of the publicly available data.

Registered Business Sites140Includes operating and developing sites
Operating centers103Includes operation and expansion plans
Map Display137Address and area-level locations distinguished
Operating and Development Entities57Names linked to public centers

Latest facility record check 2026-10-29 · The verification date for each individual record is indicated in the details. The number of registered entries does not represent the total market size nationwide.

Looking for a center that meets your needs?

Tell us your preferred location, power requirement and timing so we can outline the facility conditions to check.

You can submit an initial inquiry without signing up.

Saved regions and filters

Save up to 20 region, operator and project-stage filters to revisit current listings.

Loading saved filters…

Reopen current listings with saved filters. No email alerts are sent.

Official specification evidence 93records · latest check 2026-10-14. The listing of specifications does not imply verification of remaining capacity or the validity of certifications.

Centers by operator · 57entities
Current Search Results: Project Stage and Regional Distribution
Search Results · Operation and Development Stages

These are registered sites that match your current search criteria.

  • Operations1 items
Search Results · Regional Distribution

This is distinct from overall market share nationwide.

  • North Chungcheong Province1 items

Search Results 1Location · 1–1 shown

Compare centers 0/3Comparison and full CSV require Research Pro.
Compare selected centers →
North Chungcheong ProvinceOperations

국가기상슈퍼컴퓨터센터

Korea Meteorological Administration

충청북도 청주시 청원구 오창읍 중심상업2로72

Public Power
수전·시설전력: power_input: 14000 kW (국가기상슈퍼컴퓨터센터 공개 설비표) · IT Load: 5호기 소비전력6,354kW (시설 정격 IT Load와 구분) · UPS: ups_capacity: 13500 kVA (국가기상슈퍼컴퓨터센터 공개 설비표) · 비상발전: backup_power: 10750 kW (국가기상슈퍼컴퓨터센터 공개 설비표)
Size & facility
대지: 23,092㎡ · 연면적·건물: 8,465.8㎡ · 전산실·코로케이션: 5호기 상면780㎡ (센터 전체 상면 아님)
운영사·공식자료 확인Facility record checked 2026-10-29

Find a center and continue your review.

Please verify the facility’s publicly disclosed specifications and actual occupancy and supply conditions separately.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel