KOREA DATA CENTER DATABASE
Explore Korean data center locations and status.
Search by region, operator, and project stage, and switch between the list and map to check facility specifications and sources. Be sure to review the scope and timing of the publicly available data.
Latest facility record check 2026-10-19 · The verification date for each individual record is indicated in the details. The number of registered entries does not represent the total market size nationwide.
Looking for a center that meets your needs?
Tell us your preferred location, power requirement and timing so we can outline the facility conditions to check.
You can submit an initial inquiry without signing up.Saved regions and filters
Save up to 20 region, operator and project-stage filters to revisit current listings.
Loading saved filters…
Reopen current listings with saved filters. No email alerts are sent.
Official specification evidence 93records · latest check 2026-10-14. The listing of specifications does not imply verification of remaining capacity or the validity of certifications.
Centers by operator · 31entities
Current Search Results: Project Stage and Regional Distribution
These are registered sites that match your current search criteria.
This is distinct from overall market share nationwide.
JDC Jeju Green AI Data Center
Jeju International Free City Development Center (JDC)
Jeju High-Tech Science and Technology Complex Phase 2 (Candidate area and lot not yet determined)
제주 그린 AI 데이터센터는 제주도의 AI 전환과 공공데이터·지역산업 서비스를 지원하기 위해 검토하는 재생에너지 연계 인프라 구상입니다. 2026년 8월 JDC 이사장은 제주도·제주테크노파크 등과 기획용역을 진행하고 제2첨단과학기술단지를 후보 권역으로 검토한다고 설명했습니다.
- Public Power
- 계획 수전용량 40MW(2026-09-15 제주도 발표)·재생에너지/전력·연산 연계 기획·전기사용계약·계통접속 승인 미확인
- Size & facility
- 제주도 2026년 9월 발표상 수전 기준 40MW 구상·건물 규모·IT Load·UPS 미공개
Find a center and continue your review.
Please verify the facility’s publicly disclosed specifications and actual occupancy and supply conditions separately.
