Data Center Database/LG Uplus/Anyang, Gyeonggi Province
● Operations

LG Uplus Pyeongchon 2 Center

Gwanyang-dong, Dongan-gu, Anyang-si, Gyeonggi-do

Center OverviewPhysical Sites · PowerSame operator
Operational StatusOperations

Completed in October 2023

Public PowerDisclosed capacity: not available

Distinguish between power supply, UPS, and IT load

Facility scaleTotal floor area: 40,450 ㎡; 3 basement levels / 9 above-ground levels; over 200,000 servers

Commercial and Telecommunications

Confirm move-in conditions at this center.

Discuss facility, power and network requirements → · Compare published Korean rental products

CENTER OVERVIEW

About the Center

This is LG Uplus’s second ultra-large-scale IDC, built following the Pyeongchon Mega Center. It is an operations center designed to meet corporate customers’ needs for cloud, AI, and big data.

01Officially verify the total floor area and completion date
02Capacity to accommodate over 200,000 servers
03Disclosed power capacity and IT load require further verification.

AI-DC KOREA ANALYSIS

Interpretation and Verification Points

Official documents highlight a Tier-IV-level redundant power and cooling configuration, outdoor air cooling, separation of office and data center buildings, and a five-tier security system as key features. However, since obtaining Tier-IV “certification” and having a Tier-IV-level facility configuration are not the same, the certification status must be verified separately.

Principles for Interpreting Numbers

Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.

RESEARCH PRO

Cross-Reference Data and Licensing Detail Ledger

We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel