Operational
LG U+ Sangam Center
416 World Cup Buk-ro, Mapo-gu, Seoul
Distinguish between power supply, UPS, and IT load
Commercial and Telecommunications
Confirm move-in conditions at this center.
Discuss facility, power and network requirements → · Compare published Korean rental productsCENTER OVERVIEW
About the Center
Located in the Digital Media City business district, this large-scale telecommunications IDC serves as a hub with strong accessibility for media and content companies and excellent telecommunications network connectivity.
AI-DC KOREA ANALYSIS
Interpretation and Verification Points
On the same official page, the power capacity is listed differently as 19.25 MW (in the overview at the top) and 20 MW (in the detailed description). AI-DC KOREA does not arbitrarily consolidate these values but preserves them as discrepancies.
Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.
Cross-Reference Data and Licensing Detail Ledger
We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.
