These are currently published records at the planning, permitting, construction, or post-completion operational verification stage. They may include phases of the same campus or service projects.
Search Results76items
Address-based map location38items
All published development records76items
Map location and power supply status are verified separately. Planned incoming power, IT load and contracted power are not added together.
Development project list
Search Results 76items · 1–24 표시
Geumcheon, SeoulUnder constructionKoramco Asset Management
- Project Site
- 319-19 Gasan-dong, Geumcheon-gu, SeoulAddress-based map location
- Disclosed power information
- Undisclosed
- Facility Categories
- Commercial Data Centers
- Disclosed scale
- 대지 6,141㎡·연면적 41,214.54㎡·지하 3층/지상 11층
전남 강진Investment Agreements and Plans베네포스 등 컨소시엄(개발협약 참여)
- Project Site
- 전남광주통합특별시 강진군Building, campus or project area
- Disclosed power information
- 협약상: 사업규모 300MW · 수전·IT·전력계약 기준 미공 items
- Facility Categories
- 계획 단계 AI 데이터센터
- Disclosed scale
- 강진 개별사업 300MW 계획
공개된 사업권역입니다. 개별 필지·건물과 정확한 시설 위치는 아직 확인되지 않았습니다.
Guro, SeoulUnder constructionOperator verification in progress
- Project Site
- 166-2 Gaebong-dong, Guro-gu, SeoulAddress-based map location
- Disclosed power information
- Undisclosed
- Facility Categories
- Broadcasting and Telecommunications Facilities · Data Centers
- Disclosed scale
- CM사 공개 연면적 19,255.39㎡·지하 4층/지상 8층(기존 행정원장 20,665㎡ 별도)
Goyang, Gyeonggi ProvinceBuilding permit under review사업법인·운영사 확인 중
- Project Site
- 경기도 고양시 일산동구 식사동 293 외 19필지Address-based map location
- Disclosed power information
- 수전·IT·계약전력 미확인
- Facility Categories
- 데이터센터 개발사업
- Disclosed scale
- 공개 규모 미확인
고양시 공식 답변의 허가 신청 대상 필지입니다.
경기 군포Investment Agreements and PlansSK에코플랜트·SK디앤디(개발협약)
- Project Site
- 경기도 군포시 군포역세권 복합개발지구Building, campus or project area
- Disclosed power information
- 수전·IT: 부하·전력계약 용량 미공 items
- Facility Categories
- 계획 단계 AI 데이터센터
- Disclosed scale
- 개별: 사업부지·건축규모 미공 items
공개된 사업권역입니다. 개별 필지·건물과 정확한 시설 위치는 아직 확인되지 않았습니다.
금양·케이와이디씨(KYDC, 분할신설 예정)
- Project Site
- 부산광역시 기장군 장안읍 오리 1144 외 7필지, 금양 기장공장Address-based map location
- Disclosed power information
- 154kV 변전소·100MW급 변압기 3대 이전 계획·DC 수전용량/IT Load/UPS/PUE 미확인
- Facility Categories
- 기존 이차전지 공장 인프라 전환형 AI 데이터센터
- Disclosed scale
- 기장공장 토지·건축물과 전력·냉각·용수·공조·통신·보안 기반시설 전환 계획
기존 공장 부지의 대표지번. 데이터센터 전환 범위는 미확정.
Yongin, Gyeonggi ProvinceUnder construction다우기술(개발·운영 예정)
- Project Site
- 경기도 용인시 수지구 죽전동 23-11·23-12·23-13Address-based map location
- Disclosed power information
- 수전·IT·계약전력 미확인
- Facility Categories
- 상업용 클라우드 데이터센터
더퍼스트37(개발)
- Project Site
- 부산광역시 금정구 금사동 106-1 외 3필지Address-based map location
- Disclosed power information
- 계획 수전 90MW·서버실 60MW. 전력계약·실제 수전 개시는 미확인.
- Facility Categories
- AI 데이터센터 개발사업
- Disclosed scale
- 대지 5,558.60㎡·연면적 51,186㎡·지하 6층/지상 7층 계획
사업 참여 법무법인의 공식 개발협약 발표에서 필지를 확인했습니다.
Ansan, Gyeonggi ProvinceInvestment Agreements and Plans가비아·KINX(운영 예정) / 맥쿼리 MAIF4·가비아(개발)
- Project Site
- 경기도 안산시Building, campus or project area
- Disclosed power information
- 사업: 계획규모 40MW · 수전·IT·전력계약 기준 미공 items
- Facility Categories
- 계획 단계 하이퍼스케일·AI 데이터센터
- Disclosed scale
- 첫 안산사업 계획규모 40MW
공개된 사업권역입니다. 개별 필지·건물과 정확한 시설 위치는 아직 확인되지 않았습니다.
전남 무안Building permit under reviewProject operator not disclosed
- Project Site
- Support Block 7, Oryong-ri, Illo-eup, Muan-gun, Jeollanam-do, South KoreaBuilding, campus or project area
- Disclosed power information
- Definitions of “200MW-class planned and installed capacity,” “IT load,” and “UPS,” as well as KEPCO’s supply approval, have not been confirmed.
- Facility Categories
- Broadcasting and Telecommunications Facilities · AI Data Centers
- Disclosed scale
- Site area: 37,695.2 m²; total floor area: 85,667 m²; 3 buildings; planned maximum height: 48 m
베네포스장성디씨(시행)
- Project Site
- 전남광주통합특별시 장성군 황룡면 월평리 464 일원Address-based map location
- Disclosed power information
- 200MW급 계획(장성군 발표). 수전·IT 구분과 공급계약은 미확인.
- Facility Categories
- AI 데이터센터 개발사업
- Disclosed scale
- 대지 57,967㎡ 계획
군 발표의 사업과 옛 장성물류센터 매입·해체 허가 보도의 대표 필지를 대조했습니다.
Gangseo, BusanPermit and Licensing ProcessOperator verification in progress
- Project Site
- 1711-4 Songjeong-dong, Gangseo-gu, Busan Metropolitan City, and 4 other parcelsAddress-based map location
- Disclosed power information
- Undisclosed
- Facility Categories
- Commercial Data Centers
- Disclosed scale
- 연면적 46,107.49㎡·지상 13층(옥탑층 포함)
Gangseo, BusanConstruction completed; operating scope under verificationBusan Metropolitan City
- Project Site
- 부산광역시 강서구 에코델타대로95번길 20 (명지동 3728-1)Address-based map location
- Disclosed power information
- Undisclosed
- Facility Categories
- Public and Research Data Centers
- Disclosed scale
- 준공 건설원장: 대지 5,220㎡·연면적 3,157.99㎡·1개 동/지상 3층
Gangseo, BusanInvestment Agreements and Plans부산에코델타그린데이터센터 PFV(시행)
- Project Site
- 부산광역시 강서구 에코델타시티 그린데이터센터 집적단지Building, campus or project area
- Disclosed power information
- 사업자 발표: 상용 300MW·예비 300MW 전기사용계약(2026년 8월 보도) · 계약서 원문·실제 통전 미확인
- Facility Categories
- 계획 단계 상업용 데이터센터
- Disclosed scale
- 개별: 부지·건축규모 미공 items
공개된 사업권역입니다. 개별 필지·건물과 정확한 시설 위치는 아직 확인되지 않았습니다.
Bucheon, Gyeonggi ProvinceBefore construction beginsOperator verification in progress
- Project Site
- 222-13 Naedong, Ojeong-gu, Bucheon-si, Gyeonggi-do, and 10 other parcelsAddress-based map location
- Disclosed power information
- Undisclosed
- Facility Categories
- Private Data Centers
- Disclosed scale
- 1 basement level and 4 above-ground floors
Bucheon, Gyeonggi ProvinceUnder constructionOperator verification in progress
- Project Site
- 경기도 부천시 오정구 삼정동 13-15·16Address-based map location
- Disclosed power information
- Undisclosed
- Facility Categories
- Private Data Centers
- Disclosed scale
- 5 basement levels and 7 above-ground levels
사업주체·운영사 미공개·서한(시공)
- Project Site
- 서울특별시 강남구 대치동 999-8 일원Address-based map location
- Disclosed power information
- 계획: 수전용량 9MW·IT Load/UPS/PUE 미공 items
- Facility Categories
- 도심형 에지·AI 데이터센터
- Disclosed scale
- 대지 1,192㎡·연면적 4,949㎡·지하 5층/지상 4층·1개동 계획
Gumi, North Gyeongsang ProvinceUnder construction삼성SDS(개발)
- Project Site
- 경상북도 구미시 공단동 259-1Address-based map location
- Disclosed power information
- 초기 계획 전력용량60MW·최대120MW 확장 설계(수전·IT 구분 미공개)
- Facility Categories
- AI 데이터센터 개발사업
Ansan, Gyeonggi ProvincePlan선유코어(발주)
- Project Site
- 경기도 안산시 단원구Building, campus or project area
- Disclosed power information
- 수전·IT: 부하·전력계약 용량 미공 items
- Facility Categories
- 일반 데이터센터 설계사업 · AI 전용 여부 미확인
- Disclosed scale
- 계획 대지 1,971.8㎡ · 연면적 6,127.8㎡ · 지하1층·지상5층
공개된 사업권역입니다. 개별 필지·건물과 정확한 시설 위치는 아직 확인되지 않았습니다.
액티스코리아(투자·개발 추진, 운영사 미확인)
- Project Site
- 세종특별자치시(후보 사업지·필지 미확정)Building, campus or project area
- Disclosed power information
- 100MW 기술적 정의 미공개·수전용량·UPS·IT Load·PUE·전력계약 미확인
- Facility Categories
- AI 데이터센터·투자양해각서
- Disclosed scale
- 총: 1조8천억원·약 13만㎡·100MW급 계획·연면적·랙수 미공 items
SK증권·메테우스자산운용·시드에이치(역할 확인 중)
- Project Site
- 세종특별자치시(후보 사업지·필지 미확정)Building, campus or project area
- Disclosed power information
- 360MW 기술적 정의 미공개·수전용량·UPS·IT Load·PUE·전력계약 미확인
- Facility Categories
- AI 데이터센터·투자협약
- Disclosed scale
- 총: 7조원·360MW급 계획·대지·연면적·랙수 미공 items
Suwon, Gyeonggi ProvincePlan와이에이치디앤씨·지행파트너스(발주)
- Project Site
- 경기도 수원시 영통구Building, campus or project area
- Disclosed power information
- 수전·IT: 부하·전력계약 용량 미공 items
- Facility Categories
- 일반 데이터센터 설계사업 · AI 전용 여부 미확인
- Disclosed scale
- 3개 필지 설계 · 필지별 연면적 7,067㎡ / 6,142㎡ / 6,109㎡
공개된 사업권역입니다. 개별 필지·건물과 정확한 시설 위치는 아직 확인되지 않았습니다.
Ansan, Gyeonggi ProvinceUnder construction아워디씨
- Project Site
- 경기도 안산시 단원구 신원로91번길 79Address-based map location
- Disclosed power information
- 수전용량: 7.6MW·IT Load 4.82MW·UPS/PUE 미공 items
- Facility Categories
- 엣지 데이터센터·기업 전산수요 대응
- Disclosed scale
- 대지 3,194.90㎡·기존 제조공장 골조 유지 대수선 계획
Ansan, Gyeonggi ProvincePermit and Licensing ProcessKoramco Asset Management
- Project Site
- 712 Seonggok-dong, Danwon-gu, Ansan-si, Gyeonggi-doAddress-based map location
- Disclosed power information
- 인입전력: 40MW·IT 용량 27MW(사업자 공개)·잔여용량 미공 items
- Facility Categories
- Private Data Centers
- Disclosed scale
- 사업자 현재 공개 연면적 26,810.23㎡·지상 5층(종전 교통영향평가 36,877㎡ 별도)
Understanding project stages, locations and power information
Project status follows each center’s current published record. Distinguish permitting, construction commencement notices, actual construction, completion and operation.
Projects with a verified address-based location include an infrastructure map link. The list also includes projects identified only by campus or project area, and projects whose locations are still being reconciled.
A developer’s power plan, a contract announcement, a supplier’s response and the actual start of power supply represent different levels of confirmation. Check the source dates and conditions in each project’s details.
The number of records is not the total number of projects nationwide or the number of unique physical facilities. Operating centers are available in the full data center list.