고양 식사동 데이터센터 계획
경기도 고양시 일산동구 식사동 293 외 19필지
Public source documents 1 · Last reviewed 2026-11-21
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
고양 식사동 데이터센터 계획 · Building permit under review
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Building permit under review · 2024년 9월 건축허가 접수 확인·후속 처분 확인 중
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- 사업법인·운영사 확인 중
- Facility type
- 데이터센터 개발사업
- Building and facility size
- 공개 규모 미확인
- Verify data
- 2026-11-21
Loading project participants…
FACILITY PROFILE
About this data center
Goyang, Gyeonggi Province · 데이터센터 개발사업Some original descriptions below are in Korean. Request an English review of this facility →
식사동 293 외 19필지에 추진된 데이터센터 건축허가 신청사업입니다. 고양시 건축정책과의 2025년 3월 답변은 2024년 9월 9일 접수와 심의·기관 협의 절차를 설명합니다.
- 01건축허가 신청 필지 확인
- 02후속 허가 처분·전력 제원 추가 확인
LOCATION & ACCESS
Location and surrounding area
상세주소 확인 · 고양시 공식 답변의 허가 신청 대상 필지입니다.
Location obtained by geocoding the published address.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- 사업법인·운영사 확인 중
- Facility type
- 데이터센터 개발사업
- Building and facility size
- 공개 규모 미확인
- Public Power
- 수전·IT·계약전력 미확인
- Project Phases
- Building permit under review
- Opening and announced dates
- 2024년 9월 건축허가 접수 확인·후속 처분 확인 중
How to interpret the specifications
공개 단계는 해당 공식 답변에서 확인된 범위입니다. 후속 허가 처분과 실제 착공은 추가 확인이 필요하며, 전력 용량은 원문 대조가 완료된 수치만 반영합니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Building permit under review · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 2024년 9월 건축허가 접수 확인·후속 처분 확인 중
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 1records · latest check 2026-11-21
- 01
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.