더퍼스트37 부산 금사동 AI 데이터센터 계획
부산광역시 금정구 금사동 106-1 외 3필지
Public source documents 1 · Last reviewed 2026-11-21
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
더퍼스트37 부산 금사동 AI 데이터센터 계획 · Plan
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Plan · 2026년 9월 법률지원 업무협약·초기 개발단계
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- 더퍼스트37(개발)
- Facility type
- AI 데이터센터 개발사업
- Building and facility size
- 대지 5,558.60㎡·연면적 51,186㎡·지하 6층/지상 7층 계획
- Verify data
- 2026-11-21
Loading project participants…
FACILITY PROFILE
About this data center
부산 금정 · AI 데이터센터 개발사업Some original descriptions below are in Korean. Request an English review of this facility →
더퍼스트37이 부산 금사동 106-1 외 3필지에서 추진하는 AI 데이터센터입니다. 사업 참여 법무법인은 2026년 9월 법률지원 협약과 부지·건축·전력 계획을 발표했습니다.
- 01금사동 대상 필지 확인
- 02수전 90MW·서버실 60MW 계획
- 03초기 개발·사업구조 검토
LOCATION & ACCESS
Location and surrounding area
상세주소 확인 · 사업 참여 법무법인의 공식 개발협약 발표에서 필지를 확인했습니다.
Location obtained by geocoding the published address.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- 더퍼스트37(개발)
- Facility type
- AI 데이터센터 개발사업
- Building and facility size
- 대지 5,558.60㎡·연면적 51,186㎡·지하 6층/지상 7층 계획
- Public Power
- 계획 수전 90MW·서버실 60MW. 전력계약·실제 수전 개시는 미확인.
- Project Phases
- Plan
- Opening and announced dates
- 2026년 9월 법률지원 업무협약·초기 개발단계
How to interpret the specifications
수전 90MW와 서버실 60MW는 개발계획의 서로 다른 지표입니다. 법률지원 협약 이후 인허가·전력계통 검토·사업권·투자 및 운영구조를 준비하는 단계로, 허가와 공급계약 완료를 의미하지 않습니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Plan · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 2026년 9월 법률지원 업무협약·초기 개발단계
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 1records · latest check 2026-11-21
- 01
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.