Separate from IT, UPS and standby power
선유코어 안산 데이터센터 설계사업
경기도 안산시 단원구
Public source documents 1 · Last reviewed 2026-11-21
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
선유코어 안산 데이터센터 설계사업 · Plan
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Plan · 2026년: 8월부터 건축설계 · 개소일 미공 items
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- 선유코어(발주)
- Facility type
- 일반 데이터센터 설계사업 · AI 전용 여부 미확인
- Building and facility size
- 계획 대지 1,971.8㎡ · 연면적 6,127.8㎡ · 지하1층·지상5층
- Verify data
- 2026-11-21
Loading project participants…
FACILITY PROFILE
About this data center
Ansan, Gyeonggi Province · 일반 데이터센터 설계사업 · AI 전용 여부 미확인Some original descriptions below are in Korean. Request an English review of this facility →
선유코어가 발주하고 한림건축그룹이 수행 중인 안산 단원구 데이터센터 설계사업입니다.
- 01선유코어 발주·한림 설계
- 02상세필지·전력: 미공 items
LOCATION & ACCESS
Location and surrounding area
행정구역 확인 · 공개된 사업권역입니다. 개별 필지·건물과 정확한 시설 위치는 아직 확인되지 않았습니다.
The map shows the area center. The facility address and site boundary are not confirmed.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- 선유코어(발주)
- Facility type
- 일반 데이터센터 설계사업 · AI 전용 여부 미확인
- Building and facility size
- 계획 대지 1,971.8㎡ · 연면적 6,127.8㎡ · 지하1층·지상5층
- Public Power
- 수전·IT: 부하·전력계약 용량 미공 items
- Project Phases
- Plan
- Opening and announced dates
- 2026년: 8월부터 건축설계 · 개소일 미공 items
How to interpret the specifications
공식 설계자료로 용도와 건축규모를 확인했습니다. 상세필지와 운영사, AI 전용 여부는 공개되지 않아 기존 안산센터에 연결하지 않습니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Plan · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 2026년: 8월부터 건축설계 · 개소일 미공 items
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 1records · latest check 2026-11-21
- 01
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.