Facility at a glance
삼성SDS 구미 AI 데이터센터 · Under construction
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Under construction · 2026년11월2일 기공·건설사업
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- 삼성SDS(개발)
- Facility type
- AI 데이터센터 개발사업
- Building and facility size
- Unverified
- Verify data
- 2026-11-20
Loading project participants…
FACILITY PROFILE
About this data center
Gumi, North Gyeongsang Province · AI 데이터센터 개발사업Some original descriptions below are in Korean. Request an English review of this facility →
삼성SDS가 구미시 공단동 옛 삼성전자1캠퍼스 일부에 건설하는 AI 데이터센터다. 임수동의 기존 구미 데이터센터와 별도 사업이다.
- 012026년11월2일 기공·건설사업
- 02초기 계획 전력용량60MW·최대120MW 확장 설계(수전·IT 구분 미공개)
LOCATION & ACCESS
Location and surrounding area
상세주소 확인
Location obtained by geocoding the published address.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- 삼성SDS(개발)
- Facility type
- AI 데이터센터 개발사업
- Building and facility size
- Unverified
- Public Power
- 초기 계획 전력용량60MW·최대120MW 확장 설계(수전·IT 구분 미공개)
- Project Phases
- Under construction
- Opening and announced dates
- 2026년11월2일 기공·건설사업
How to interpret the specifications
공개 개발자료의 계획값입니다. 전기사용계약·실제 통전·현재 가동 용량으로 분류하지 않습니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Under construction · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 2026년11월2일 기공·건설사업
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 2records · latest check 2026-11-20
- 01
- 02
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.