● Investment Agreements and Plans계획 단계 AI 데이터센터

강진 베네포스 컨소시엄 AI 데이터센터 계획

전남광주통합특별시 강진군

Public source documents 1 · Last reviewed 2026-11-21

Total incoming and facility power협약상: 사업규모 300MW · 수전·IT·전력계약 기준 미공 items

Separate from IT, UPS and standby power

Total IT load-

Facility specification · separate from current availability

Total physical racks-

Facility rack count · separate from remaining inventory

IT room and colocation area-

Separate from gross floor and building area

FACILITY INTELLIGENCE

Facility at a glance

강진 베네포스 컨소시엄 AI 데이터센터 계획 · Investment Agreements and Plans

Investment Agreements and Plans
Select a topic to explore
강진 베네포스 컨소시엄 AI 데이터센터 계획: schematic of development scale. Does not reproduce the actual layout or site boundaries.Building dimensions · Development StageConceptual Diagram · 실배치 아님01최고Unverified대지 면적 미확인Investment Agreements and Plans
Currently documented project stageInvestment Agreements and Plans

Permit, construction and use-approval milestones reflect the scope of each documented record.

Last reviewed 2026-11-21Planned specifications · Separate from completed construction

Current status

CURRENT STATUS / FACILITY

Current facility status and operating features

Investment Agreements and Plans · 착공·개소: 목표 미공 items

Distinguish total facility capacity from capacity currently available to lease.

Operation and development
베네포스 등 컨소시엄(개발협약 참여)
Facility type
계획 단계 AI 데이터센터
Building and facility size
강진 개별사업 300MW 계획
Verify data
2026-11-21

Loading project participants…

FACILITY PROFILE

About this data center

전남 강진 · 계획 단계 AI 데이터센터

Some original descriptions below are in Korean. Request an English review of this facility →

전남도와 강진군, 민간 참여기관이 2026년 1월 협약으로 공개한 강진 300MW AI 데이터센터 계획입니다.

  • 012026년 1월 16일 협약
  • 02강진 300MW 계획규모

LOCATION & ACCESS

Location and surrounding area

행정구역 확인 · 공개된 사업권역입니다. 개별 필지·건물과 정확한 시설 위치는 아직 확인되지 않았습니다.

Location area · indicative position
Loading the location map
The dashed circle is a reference for the recorded area.
Published location전남광주통합특별시 강진군

The map shows the area center. The facility address and site boundary are not confirmed.

FACILITIES & SERVICES

Facilities and operating features

Based on public information for this facility.
Operating and Development Entities
베네포스 등 컨소시엄(개발협약 참여)
Facility type
계획 단계 AI 데이터센터
Building and facility size
강진 개별사업 300MW 계획
Public Power
협약상: 사업규모 300MW · 수전·IT·전력계약 기준 미공 items
Project Phases
Investment Agreements and Plans
Opening and announced dates
착공·개소: 목표 미공 items
How to interpret the specifications

동일 협약의 장성 200MW 사업과 구분합니다. 베네포스·대우건설·KT 등은 협약 참여기관이며 최종 운영계약과 현재 전력공급은 별도 확인이 필요합니다.

Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.

Colocation and lease terms

Loading space availability and lease terms…

Want to know the colocation conditions at this center?

The center name is prefilled in your inquiry. Add your required capacity and timing if known.

You can submit an initial inquiry without signing up.

Participants and investment

Loading participants, investments and delivery history…

Development and completion history

PERMIT & DEVELOPMENT

Permitting and development history

Investment Agreements and Plans · Check the scope of each building permit, construction start and use approval record.

Search the permit register →
Operation and opening
착공·개소: 목표 미공 items

Power, cooling and building

Loading power, cooling and building specifications…

Sources and review history

SOURCES & UPDATES

Sources and review dates

The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.

Public source documents 1records · latest check 2026-11-21

  1. 01
    장성·강진 AI 데이터센터 구축 협약 ↗

    South Jeolla Province

    Source reference date 2026-01-16 · Observed 2026-11-21

Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.

Suggest a correction or provide information →

Loading linked supporting evidence…

Loading additional records…

Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel