2025년 5월 착공·2027년 4분기 RFS 목표
Digital Edge SEL3
Bupyeong-gu, Incheon Metropolitan City (same campus adjacent to SEL2)
Distinguish between power supply, UPS, and IT load
Hyperscale·AI-ready
Confirm move-in conditions at this center.
Discuss facility, power and network requirements → · Compare published Korean rental productsSource-backed facility metrics
Design values, targets and operator-disclosed figures are distinguished. Total facility capacity is not the remaining capacity available for lease, and kVA and kW are not used interchangeably.
Expand a category to check the source location and applicable scope. Review dates refer to document checks, not equipment changes.
Facility milestones and spatial scope
Publication, review and actual start dates are distinct. Occupancy approval does not establish commercial operation, and published capacity is not saleable inventory.
Event comparison date: 2026-10-16 · Latest evidenced event by date: Construction started
This shows the order of evidenced events and does not establish the facility’s overall current operating status.
Wide markers show uncertainty within a stated month or year, not construction or operating duration. Planned dates are not treated as completed events.
| Milestone event | Source event date | Source / reference dates |
|---|---|---|
| 1. Construction started Reported actual event | 2025-05 Month precision | Digital Edge ↗ Source date: 2025-07-10 · Confirm: 2026-10-14 Construction on SEL3 paragraph 원문은 월까지만 명시합니다. 임의의 일자를 부여하지 않습니다. |
Saleable inventory and total market supply require separate verification.
Milestone and scope JSONOperations and facility information 4 Evidence records
| Indicators | Published value | Basis / phase | Source / reference dates |
|---|---|---|---|
| 부평 캠퍼스 전체 계획 규모 | 96 MW | Target value campus sel2 sel3 | Digital Edge ↗ Source date: 2025-07-10 Confirm: 2026-10-14 Evidence location / interpretation limitsopening paragraph / full 96MW campus SEL2와 SEL3가 포함된 캠퍼스 전체 값입니다. SEL3 단독 시설이나 판매가능재고에 합산하지 않으며 2022년120MW·2024년100+MW 발표를 지우지 않습니다. |
| 착공 시 points | 2025-05 date_month | Operator-disclosed specifications construction | Digital Edge ↗ Source date: 2025-07-10 Confirm: 2026-10-14 Evidence location / interpretation limitsConstruction on SEL3 paragraph 원문은 월까지만 명시합니다. 임의의 일자를 부여하지 않습니다. |
| 운영사 계획 용량 | 60 MW | Target value phase 2 planned | Digital Edge ↗ Source date: 2025-07-10 Confirm: 2026-10-14 Evidence location / interpretation limitsSEL3 capacity paragraph 원문 Capacity 값. IT/수전 정의와 현재 판매가능 잔여량은 명시되지 않아 해당 합계로 전용하지 않습니다. |
| 가동 목표 분기 | 2027-Q4 | Target value planned operation | Digital Edge ↗ Source date: 2025-07-10 Confirm: 2026-10-14 Evidence location / interpretation limitsConstruction on SEL3 paragraph 목표 분기입니다. 실제 운영 또는 특정 날짜로 확정하지 않습니다. |
CENTER OVERVIEW
About the Center
SEL2와 같은 부평 캠퍼스에 건설 중인 별도 2단계 시설로, 완공 시 캠퍼스 전체 IT 용량을 96MW로 확대할 계획입니다.
AI-DC KOREA ANALYSIS
Interpretation and Verification Points
60MW는 SEL3의 계획 IT Load이며 SEL2의 운영 IT Load 36MW와 구분합니다. 2025년 5월 착공과 2027년 4분기 RFS는 운영사 공식 목표로, 현재 운영 중인 용량으로 합산하지 않습니다. UPS·수전용량은 공개 원문에서 별도로 확인되지 않았습니다.
Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.
Cross-Reference Data and Licensing Detail Ledger
We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.