Digital Edge SEL5
Siheung National Industrial Complex, Ansan City, Gyeonggi Province (official detailed address not disclosed)
Distinguish between power supply, UPS, and IT load
Hyperscale·AI-ready
Confirm move-in conditions at this center.
Discuss facility, power and network requirements → · Compare published Korean rental productsSource-backed facility metrics
Design values, targets and operator-disclosed figures are distinguished. Total facility capacity is not the remaining capacity available for lease, and kVA and kW are not used interchangeably.
Expand a category to check the source location and applicable scope. Review dates refer to document checks, not equipment changes.
Facility milestones and spatial scope
Publication, review and actual start dates are distinct. Occupancy approval does not establish commercial operation, and published capacity is not saleable inventory.
Event comparison date: 2026-10-15 · Latest evidenced event by date: Stage unverified
This shows the order of evidenced events and does not establish the facility’s overall current operating status.
No stage events with verified source dates are available. Review dates do not fill missing event dates.
Capacity evidence by definition
| Capacity definition | Published value | Basis / phase | Source / reference dates |
|---|---|---|---|
| Utility-feed capacity | 90 MVA | Operator-disclosed specifications power agreement announced | Digital Edge ↗ 2026-06-08 · Confirm: 2026-10-14 운영사 공개 발표입니다. 계약 원본·계통접속·통전·현재 유효성은 별도 확인하며 MVA를 MW로 환산하지 않습니다. |
Upper bounds and targets are not converted into confirmed capacity. Capacities with different definitions, parent/child scopes or stages are not summed.
Saleable inventory and total market supply require separate verification.
Milestone and scope JSONPower and backup supply 1 Evidence records
| Indicators | Published value | Basis / phase | Source / reference dates |
|---|---|---|---|
| 전력계약 발표 용량 | 90 MVA | Operator-disclosed specifications power agreement announced | Digital Edge ↗ Source date: 2026-06-08 Confirm: 2026-10-14 Evidence location / interpretation limitsopening paragraph / 90 MVA power agreement 운영사 공개 발표입니다. 계약 원본·계통접속·통전·현재 유효성은 별도 확인하며 MVA를 MW로 환산하지 않습니다. |
Operations and facility information 1 Evidence records
| Indicators | Published value | Basis / phase | Source / reference dates |
|---|---|---|---|
| 신규 센터 계획 규모 | 60 MW | Target value site acquired development planned | Digital Edge ↗ Source date: 2026-06-08 Confirm: 2026-10-14 Evidence location / interpretation limitsopening paragraph / 60 MW hyperscale data center 개발계획 규모이며 운영중·판매가능재고가 아닙니다. 원문 해당 문장에 IT/수전 정의가 없으므로 단정하지 않습니다. |
CENTER OVERVIEW
About the Center
Digital Edge가 시화국가산업단지에 확보한 안산 신규 데이터센터 사업지로, 고밀도 AI 워크로드와 액체냉각 지원을 계획합니다.
AI-DC KOREA ANALYSIS
Interpretation and Verification Points
90MVA는 전력계약, 60MW는 계획 IT Load, 1.25 미만은 연간 목표 PUE로 서로 다른 지표입니다. 운영사 발표는 부지와 전력계약을 확인하지만 건축허가·착공·상업가동을 의미하지 않습니다. 두 개의 독립 154kV 변전소를 활용하는 이중 전원 계획도 한전 공급완료나 현재 운영용량으로 확대 해석하지 않습니다.
Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.
Cross-Reference Data and Licensing Detail Ledger
We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.