Operational
Digital Edge SEL1
646-1 Yeoksam-dong, Gangnam-gu, Seoul
Distinguish between power supply, UPS, and IT load
Carrier-Neutral · Colocation
Confirm move-in conditions at this center.
Discuss facility, power and network requirements → · Compare published Korean rental productsSource-backed facility metrics
Design values, targets and operator-disclosed figures are distinguished. Total facility capacity is not the remaining capacity available for lease, and kVA and kW are not used interchangeably.
Expand a category to check the source location and applicable scope. Review dates refer to document checks, not equipment changes.
Operations and facility information 1 Evidence records
| Indicators | Published value | Basis / phase | Source / reference dates |
|---|---|---|---|
| 운영사 표기 용량 | 2.4 MW | Operator-disclosed specifications Operational facility scope | Digital Edge ↗ Source date: Not stated Confirm: 2026-10-14 Evidence location / interpretation limitsSEL1 / Capacity 원문 Capacity 값. IT/수전 정의와 현재 판매가능 잔여량은 명시되지 않아 해당 합계로 전용하지 않습니다. |
CENTER OVERVIEW
About the Center
강남 업무지구의 네트워크 밀집도와 다크파이버 접근성을 강조하는 도심형 센터입니다.
AI-DC KOREA ANALYSIS
Interpretation and Verification Points
같은 공식 페이지에서 전력이 4.8MW와 2.4MW로 다르게 표기됩니다. 어느 값을 임의 채택하지 않고 공식 수치 불일치로 보존했습니다.
Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.
Cross-Reference Data and Licensing Detail Ledger
We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.
