Digital Edge SEL2

422 Cheongcheon-dong, Bupyeong-gu, Incheon, South Korea

Center OverviewPhysical Sites · PowerSame operator
Operational StatusOperations

2024년 8월 RFS 도달(운영사 후속 발표)

Public PowerIT capacity: 36 MW

Distinguish between power supply, UPS, and IT load

Facility SizeBupyeong Campus Phase 1

AI-ready · Carrier-neutral

Confirm move-in conditions at this center.

Discuss facility, power and network requirements → · Compare published Korean rental products

Source-backed facility metrics

Design values, targets and operator-disclosed figures are distinguished. Total facility capacity is not the remaining capacity available for lease, and kVA and kW are not used interchangeably.

Evidence records 2Facility metrics 2Official Source Text 2Last reviewed 2026-10-14

Expand a category to check the source location and applicable scope. Review dates refer to document checks, not equipment changes.

Facility milestones and spatial scope

Publication, review and actual start dates are distinct. Occupancy approval does not establish commercial operation, and published capacity is not saleable inventory.

Event comparison date: 2026-10-15 · Latest evidenced event by date: Commercial operations started

This shows the order of evidenced events and does not establish the facility’s overall current operating status.

2024-08-012024-08-311Commercial operations started · 2024-08 · Reported actual eventCommercial operations started · 2024-08 · Reported actual event

Wide markers show uncertainty within a stated month or year, not construction or operating duration. Planned dates are not treated as completed events.

Milestone eventSource event dateSource / reference dates
1. Commercial operations started
Reported actual event
2024-08
Month precision
Digital Edge ↗
Source date: 2025-07-10 · Confirm: 2026-10-14
SEL2 Ready-for-Service paragraph
2025년 운영사 발표가 명시한 RFS 도달월입니다. 2024-10-16 보도자료 발표일과 구분하며 고객 IT부하 실측 가동률을 뜻하지 않습니다.

Saleable inventory and total market supply require separate verification.

Milestone and scope JSON
Operations and facility information 2 Evidence records
IndicatorsPublished valueBasis / phaseSource / reference dates
RFS 도달 시 points2024-08 date_monthOperator-disclosed specifications
ready for service
Digital Edge ↗
Source date: 2025-07-10
Confirm: 2026-10-14
Evidence location / interpretation limits

SEL2 Ready-for-Service paragraph

2025년 운영사 발표가 명시한 RFS 도달월입니다. 2024-10-16 보도자료 발표일과 구분하며 고객 IT부하 실측 가동률을 뜻하지 않습니다.

운영사 표기 용량36 MWOperator-disclosed specifications
Operational facility scope
Digital Edge ↗
Source date: Not stated
Confirm: 2026-10-14
Evidence location / interpretation limits

Seoul Bupyeong Campus / Capacity

원문 Capacity 값. IT/수전 정의와 현재 판매가능 잔여량은 명시되지 않아 해당 합계로 전용하지 않습니다.

CENTER OVERVIEW

About the Center

고밀도·액체냉각을 지원하는 Digital Edge의 부평 AI-ready 데이터센터입니다.

01IT capacity: 36 MW
02최대 130kW 랙·액체냉각
03설계 PUE 1.25·공식 연간 PUE 1.28

AI-DC KOREA ANALYSIS

Interpretation and Verification Points

36MW는 SEL2의 IT 용량이며 SEL3 60MW와 합산한 캠퍼스 96MW와 구분했습니다. 2024년 개관 발표의 설계 PUE 1.25와 현재 운영사 센터 페이지의 연간 PUE 1.28은 시점과 정의가 달라 각각 보존합니다.

Principles for Interpreting Numbers

Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.

RESEARCH PRO

Cross-Reference Data and Licensing Detail Ledger

We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.

Start a consultation · Choose a channel