Operational
Digital Edge PUS1
32 Centum 7-ro, Haeundae-gu, Busan, South Korea
Distinguish between power supply, UPS, and IT load
Carrier-neutral and submarine cable connectivity
Confirm move-in conditions at this center.
Discuss facility, power and network requirements → · Compare published Korean rental productsSource-backed facility metrics
Design values, targets and operator-disclosed figures are distinguished. Total facility capacity is not the remaining capacity available for lease, and kVA and kW are not used interchangeably.
Expand a category to check the source location and applicable scope. Review dates refer to document checks, not equipment changes.
Operations and facility information 1 Evidence records
| Indicators | Published value | Basis / phase | Source / reference dates |
|---|---|---|---|
| 운영사 계획 갱신 용량 | 4.5 MW | Target value planned update | Digital Edge ↗ Source date: Not stated Confirm: 2026-10-14 Evidence location / interpretation limitsPUS1 / Capacity 원문 Capacity에 planned update가 붙어 있어 현 운영 IT용량·수전용량으로 확정하지 않습니다. |
CENTER OVERVIEW
About the Center
부산 센텀시티와 케이블 랜딩 연결성을 기반으로 동북아 트래픽을 지원하는 거점입니다.
AI-DC KOREA ANALYSIS
Interpretation and Verification Points
운영사 현재 페이지는 4.5MW를 제시하면서 ‘planned update’라고 함께 표기합니다. 이를 현재 확정 IT Load로 단정하지 않고 계획·갱신 수치로 보존합니다. 같은 페이지의 연간 PUE 1.5는 전력용량과 분리했습니다.
Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.
Cross-Reference Data and Licensing Detail Ledger
We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.