POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 25items · current page 1–25 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-c51c11d342fe8e3599c667eb
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_de55030eafee1fe3
stable_project_keyprjtDef:232436:ESB
project_definition232436
first_region_codeESB
manual_source_formatfalse
project_name154kV 고수분기T/L 건설사업
project_name_list154kV 고수분기T/L 건설사업
purpose고창지역 신재생발전 접속용량 확보
project_region_detail전북특별자치도 고창군
project_period_raw2021.10~2028.10
project_scale_raw154KV ASCC/TW 430 X 2C X 0.334KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type가공송전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_8141960f5feb1917
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_de55030eafee1fe3

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_de55030eafee1fe3

Sources EV-c51c11d342fe8e3599c667eb
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 6ca724f13d37d37375787b74e12b77dc49b8cf29062e48c5166af1fe43d87fa9
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2026-06
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source schedule candidates · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232436|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source snapshots by date · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_8141960f5feb1917
stable_project_idkproj_de55030eafee1fe3
source_key202609|232436|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 고수분기T/L 건설사업
project_name_detail154kV 고수분기T/L 건설사업
region_summary_raw전북특별자치도 고창군등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 고창지역 신재생발전 접속용량 확보
Project region
  • 전북특별자치도 고창군
Project period
  • 2021.10~2028.10
사업 규모
  • 154KV ASCC/TW 430 X 2C X 0.334KM
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2023.12 입지선정위원회 구성시기: 2024.01 참여 위원 수 : 17 지장유무 조회: 2024.03~2024.03 경과지(부지) 확정: 2024.07
환경/재해 영향평가
  • 환경영향평가: 2025.03 ~ 2025.06 재해영향평가: 2025.03 ~ 2025.06
주민의견 수렴
  • 지자체 공고 열람: 2025.04 ~ 2025.05 설명회·공청회: 2025.04 자체설명회: 2024.03 ~ 2024.03
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
  • 2026.06
사업설계
  • 설계용역: 2023.08 ~ 2027.05 기본설계: 2026.02 ~ 2026.03 실시설계: 설계담당자: [redacted]
[추진실적] □ ‘21. 10 : 제9차 장기 송변전설비계획 신규 반영 □ ‘22. 02 : 고창군 일반산단 내 변전소 부지할애 요청 (→고창군) □ ‘22. 03 : 일반산단 내 변전소 부지 협조 가능 회신 (←고창군) □ ’22. 05 : 변전소 예비 후보부지 선정관련 대관협의 (고창군) □ ‘22. 11 : 산단내 최적부지 선정관련 협의 (고창군) □ ‘22. 12 : 후보 지중경과지 도로점용 관련 협의(전주국토관리사무소) □ ‘23. 02 : 도로굴착 가능여부 회신요청(→전주국토관리사무소) □ ‘23. 03 : 도로굴착 심의 작성용역 발주 □ ‘23. 04 : 도로굴착 심의 신청(23번 국도) □ ‘23. 05 : 도로굴착 심의 결과(도로점용 불가) □ ‘23. 06 : 제2차 입지선정 실무위원회 시행(변전소 부지 관련) □ ‘23. 07 : 변전소 위치 관련 고창군 협의 □ ’23. 08 : 인근 마을 대상 사업설명회 □ ’24. 01 ~ 05 : 제 1차 ~ 4차 입지선정위원회 시행 □ ‘24. 06 : 건설 및 운영부서 등 관계자 회의 시행[전북건(송변)-1157] □ ‘24. 07 : 입지확정위원회 시행(변전소 명칭 확정 : 고수S/S) □ ‘25. 03 : 소규모 환경 및 재해영향평가 시행 □ ‘25. 04 : 주민설명회 시행 □ ‘25. 06 : 실시계획 승인 신청 □ ‘26. 06 : 실시계획 승인[관보고시문 제2026-132호] □ ‘26. 08 : 사업시행계획 제출(변경승인) [향후계획] □ ‘27. 06 : 공사 착공 □ ‘28. 10 : 기기 가압
future_plan_redacted□ 향후계획 [추진실적] □ ‘21. 10 : 제9차 장기 송변전설비계획 신규 반영 □ ‘22. 02 : 고창군 일반산단 내 변전소 부지할애 요청 (→고창군) □ ‘22. 03 : 일반산단 내 변전소 부지 협조 가능 회신 (←고창군) □ ’22. 05 : 변전소 예비 후보부지 선정관련 대관협의 (고창군) □ ‘22. 11 : 산단내 최적부지 선정관련 협의 (고창군) □ ‘22. 12 : 후보 지중경과지 도로점용 관련 협의(전주국토관리사무소) □ ‘23. 02 : 도로굴착 가능여부 회신요청(→전주국토관리사무소) □ ‘23. 03 : 도로굴착 심의 작성용역 발주 □ ‘23. 04 : 도로굴착 심의 신청(23번 국도) □ ‘23. 05 : 도로굴착 심의 결과(도로점용 불가) □ ‘23. 06 : 제2차 입지선정 실무위원회 시행(변전소 부지 관련) □ ‘23. 07 : 변전소 위치 관련 고창군 협의 □ ’23. 08 : 인근 마을 대상 사업설명회 □ ’24. 01 ~ 05 : 제 1차 ~ 4차 입지선정위원회 시행 □ ‘24. 06 : 건설 및 운영부서 등 관계자 회의 시행[전북건(송변)-1157] □ ‘24. 07 : 입지확정위원회 시행(변전소 명칭 확정 : 고수S/S) □ ‘25. 03 : 소규모 환경 및 재해영향평가 시행 □ ‘25. 04 : 주민설명회 시행 □ ‘25. 06 : 실시계획 승인 신청 □ ‘26. 06 : 실시계획 승인[관보고시문 제2026-132호] □ ‘26. 08 : 사업시행계획 제출(변경승인) [향후계획] □ ‘27. 06 : 공사 착공 □ ‘28. 10 : 기기 가압
attachment_count0
source_detail_sha2568cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232436|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_8141960f5feb1917

Sources EV-a53168c3f4e6525465600bbb
Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e
행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82
Source snapshots by date · KOR · kepco_planned

154kV 고수분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_de55030eafee1fe3
stable_project_keyprjtDef:232436:ESB
project_definition232436
first_region_codeESB
manual_source_formatfalse
project_name154kV 고수분기T/L 건설사업
project_name_list154kV 고수분기T/L 건설사업
purpose고창지역 신재생발전 접속용량 확보
project_region_detail전북특별자치도 고창군
project_period_raw2021.10~2028.10
project_scale_raw154KV ASCC/TW 430 X 2C X 0.334KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type가공송전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_8141960f5feb1917
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_de55030eafee1fe3

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_de55030eafee1fe3

Sources EV-c51c11d342fe8e3599c667eb
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 6ca724f13d37d37375787b74e12b77dc49b8cf29062e48c5166af1fe43d87fa9

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel