POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 25items · current page 1–25 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-c51c11d342fe8e3599c667eb
Detailed source fields Original source field Published value or condition stable_project_id kproj_de55030eafee1fe3 stable_project_key prjtDef:232436:ESB project_definition 232436 first_region_code ESB manual_source_format false project_name 154kV 고수분기T/L 건설사업 project_name_list 154kV 고수분기T/L 건설사업 purpose 고창지역 신재생발전 접속용량 확보 project_region_detail 전북특별자치도 고창군 project_period_raw 2021.10~2028.10 project_scale_raw 154KV ASCC/TW 430 X 2C X 0.334KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_de55030eafee1fe3
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_de55030eafee1fe3
Sources EV-c51c11d342fe8e3599c667eb Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 6ca724f13d37d37375787b74e12b77dc49b8cf29062e48c5166af1fe43d87fa9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2026-06 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232436|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_8141960f5feb1917 stable_project_id kproj_de55030eafee1fe3 source_key 202609|232436|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 고수분기T/L 건설사업 project_name_detail 154kV 고수분기T/L 건설사업 region_summary_raw 전북특별자치도 고창군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 사업 규모 154KV ASCC/TW 430 X 2C X 0.334KM 입지선정 전력입지영향평가 용역 착수: 2023.12 입지선정위원회 구성시기: 2024.01 참여 위원 수 : 17 지장유무 조회: 2024.03~2024.03 경과지(부지) 확정: 2024.07 환경/재해 영향평가 환경영향평가: 2025.03 ~ 2025.06 재해영향평가: 2025.03 ~ 2025.06 주민의견 수렴 지자체 공고 열람: 2025.04 ~ 2025.05 설명회·공청회: 2025.04 자체설명회: 2024.03 ~ 2024.03 사업설계 설계용역: 2023.08 ~ 2027.05 기본설계: 2026.02 ~ 2026.03 실시설계: 설계담당자: [redacted] [추진실적] □ ‘21. 10 : 제9차 장기 송변전설비계획 신규 반영 □ ‘22. 02 : 고창군 일반산단 내 변전소 부지할애 요청 (→고창군) □ ‘22. 03 : 일반산단 내 변전소 부지 협조 가능 회신 (←고창군) □ ’22. 05 : 변전소 예비 후보부지 선정관련 대관협의 (고창군) □ ‘22. 11 : 산단내 최적부지 선정관련 협의 (고창군) □ ‘22. 12 : 후보 지중경과지 도로점용 관련 협의(전주국토관리사무소) □ ‘23. 02 : 도로굴착 가능여부 회신요청(→전주국토관리사무소) □ ‘23. 03 : 도로굴착 심의 작성용역 발주 □ ‘23. 04 : 도로굴착 심의 신청(23번 국도) □ ‘23. 05 : 도로굴착 심의 결과(도로점용 불가) □ ‘23. 06 : 제2차 입지선정 실무위원회 시행(변전소 부지 관련) □ ‘23. 07 : 변전소 위치 관련 고창군 협의 □ ’23. 08 : 인근 마을 대상 사업설명회 □ ’24. 01 ~ 05 : 제 1차 ~ 4차 입지선정위원회 시행 □ ‘24. 06 : 건설 및 운영부서 등 관계자 회의 시행[전북건(송변)-1157] □ ‘24. 07 : 입지확정위원회 시행(변전소 명칭 확정 : 고수S/S) □ ‘25. 03 : 소규모 환경 및 재해영향평가 시행 □ ‘25. 04 : 주민설명회 시행 □ ‘25. 06 : 실시계획 승인 신청 □ ‘26. 06 : 실시계획 승인[관보고시문 제2026-132호] □ ‘26. 08 : 사업시행계획 제출(변경승인) [향후계획] □ ‘27. 06 : 공사 착공 □ ‘28. 10 : 기기 가압 future_plan_redacted □ 향후계획 [추진실적] □ ‘21. 10 : 제9차 장기 송변전설비계획 신규 반영 □ ‘22. 02 : 고창군 일반산단 내 변전소 부지할애 요청 (→고창군) □ ‘22. 03 : 일반산단 내 변전소 부지 협조 가능 회신 (←고창군) □ ’22. 05 : 변전소 예비 후보부지 선정관련 대관협의 (고창군) □ ‘22. 11 : 산단내 최적부지 선정관련 협의 (고창군) □ ‘22. 12 : 후보 지중경과지 도로점용 관련 협의(전주국토관리사무소) □ ‘23. 02 : 도로굴착 가능여부 회신요청(→전주국토관리사무소) □ ‘23. 03 : 도로굴착 심의 작성용역 발주 □ ‘23. 04 : 도로굴착 심의 신청(23번 국도) □ ‘23. 05 : 도로굴착 심의 결과(도로점용 불가) □ ‘23. 06 : 제2차 입지선정 실무위원회 시행(변전소 부지 관련) □ ‘23. 07 : 변전소 위치 관련 고창군 협의 □ ’23. 08 : 인근 마을 대상 사업설명회 □ ’24. 01 ~ 05 : 제 1차 ~ 4차 입지선정위원회 시행 □ ‘24. 06 : 건설 및 운영부서 등 관계자 회의 시행[전북건(송변)-1157] □ ‘24. 07 : 입지확정위원회 시행(변전소 명칭 확정 : 고수S/S) □ ‘25. 03 : 소규모 환경 및 재해영향평가 시행 □ ‘25. 04 : 주민설명회 시행 □ ‘25. 06 : 실시계획 승인 신청 □ ‘26. 06 : 실시계획 승인[관보고시문 제2026-132호] □ ‘26. 08 : 사업시행계획 제출(변경승인) [향후계획] □ ‘27. 06 : 공사 착공 □ ‘28. 10 : 기기 가압 attachment_count 0 source_detail_sha256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232436|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8141960f5feb1917
Sources EV-a53168c3f4e6525465600bbb Evidence SHA-256 8cae54a0f34841d529b5269e8e14b53bae8b9472a4f484819cc721eb9b1fe78e 행 SHA-256 d3f37f7d93122e2321d9c49987dd99c30e80d9de212ff008734eb9e41d09dc82 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_de55030eafee1fe3 stable_project_key prjtDef:232436:ESB project_definition 232436 first_region_code ESB manual_source_format false project_name 154kV 고수분기T/L 건설사업 project_name_list 154kV 고수분기T/L 건설사업 purpose 고창지역 신재생발전 접속용량 확보 project_region_detail 전북특별자치도 고창군 project_period_raw 2021.10~2028.10 project_scale_raw 154KV ASCC/TW 430 X 2C X 0.334KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_de55030eafee1fe3
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_de55030eafee1fe3
Sources EV-c51c11d342fe8e3599c667eb Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 6ca724f13d37d37375787b74e12b77dc49b8cf29062e48c5166af1fe43d87fa9 Observations for this power asset History for this project