POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 28items · current page 1–28 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-c262722841fea18a1b66dd7f
Detailed source fields Original source field Published value or condition stable_project_id kproj_b13e1a5e6ce037f0 stable_project_key prjtDef:231564:ESB project_definition 231564 first_region_code ESB manual_source_format false project_name 154kV 나주S/S ESS 건설사업 project_name_list 154kV 나주변전소 ESS 건설사업 purpose 전력계통 불안정 해소를 위한 ESS설치 project_region_detail 전남광주통합특별시 나주시 project_period_raw 2021.03~2027.12 project_scale_raw 56MW ESS responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_b13e1a5e6ce037f0
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_b13e1a5e6ce037f0
Sources EV-c262722841fea18a1b66dd7f Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 bc4a7f978e56c110674e8c5da7c862a74eb8aa8c8ec2cd0b547b7f61d04dc4b9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2026-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231564|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_e071beada30e0895 stable_project_id kproj_b13e1a5e6ce037f0 source_key 202609|231564|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 나주변전소 ESS 건설사업 project_name_detail 154kV 나주S/S ESS 건설사업 region_summary_raw 전남광주통합특별시 나주시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 직할 section_fields 계획확정 제10차 장기송변전설비계획 반영(2024.07) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 2026.02 ~ 2026.05 설계담당자: [redacted] □ ‘21.03 : ESS 건설사업 기준 정립 T/F 회의 시행(송변전건설처) □ ‘21.12 : 예비타당성조사 탈락에 따른 ESS 건설사업 중단 □ ‘23.04 : 10차 장기 송변전계획 확정에 따른 사업 재개 □ ‘24.06 : 계통안정화 ESS 건설사업 사전준비 실무회의 □ ‘24.07 : ‘26~‘28년 계통안정화 ESS 건설사업 추진계획 공문 수신 □ ‘24.09 : 계통안정화 ESS 건설사업 사업수행 적정성 재검토 T/F 구성·운영 □ ‘25.05 : 사업관계자 현장회의 시행 □ ‘25.06 : 설비배치 관계자 회의 시행 □ ‘25.09 : 기본설계 심의위원회 개최 및 결과보고 □ ‘26.01 : 154kV 나주S/S ESS 건설사업 기기배치 관련 관계자 현장 회의시행 □ ‘26.02 : 154kV 나주S/S ESS 건설사업 기기배치 변경안 확정 □ ‘26.05 : 154kV 나주S/S ESS 제어동 구조 변경 요청(광주전남본부) □ ‘26.05 : 서안성S/S 자재 재활용 관련 회의 - 23kV GIS, 154kV M.Tr 신규 발주 - M.Tr 적기 수급불가 → 기발주분(광주전남) 선사용 □ ‘26.06 : 실시설계(안) 완료 □ ‘26.06 : 제어동 출입구 변경 관계자 회의 시행(운영·설계·시공 부서 등) □ ‘26.06 : 154kV 나주S/S ESS 건설공사(일반) 발주 □ ‘26.07 : 154kV 나주S/S 56MW ESS 설치조건부(EPC) 자재구매 발주 □ ‘26.07 : 제어동 출입구 변경 관계자 회의 결과 보고 - 시공성, 경제성 및 적기준공 가능여부 등에 따라 제어동 출입문 추가 설치 결정 □ ‘26.07 : 154kV 나주S/S ESS 건설공사 책임감리 용역 발주 future_plan_redacted □ 향후계획 □ ‘21.03 : ESS 건설사업 기준 정립 T/F 회의 시행(송변전건설처) □ ‘21.12 : 예비타당성조사 탈락에 따른 ESS 건설사업 중단 □ ‘23.04 : 10차 장기 송변전계획 확정에 따른 사업 재개 □ ‘24.06 : 계통안정화 ESS 건설사업 사전준비 실무회의 □ ‘24.07 : ‘26~‘28년 계통안정화 ESS 건설사업 추진계획 공문 수신 □ ‘24.09 : 계통안정화 ESS 건설사업 사업수행 적정성 재검토 T/F 구성·운영 □ ‘25.05 : 사업관계자 현장회의 시행 □ ‘25.06 : 설비배치 관계자 회의 시행 □ ‘25.09 : 기본설계 심의위원회 개최 및 결과보고 □ ‘26.01 : 154kV 나주S/S ESS 건설사업 기기배치 관련 관계자 현장 회의시행 □ ‘26.02 : 154kV 나주S/S ESS 건설사업 기기배치 변경안 확정 □ ‘26.05 : 154kV 나주S/S ESS 제어동 구조 변경 요청(광주전남본부) □ ‘26.05 : 서안성S/S 자재 재활용 관련 회의 - 23kV GIS, 154kV M.Tr 신규 발주 - M.Tr 적기 수급불가 → 기발주분(광주전남) 선사용 □ ‘26.06 : 실시설계(안) 완료 □ ‘26.06 : 제어동 출입구 변경 관계자 회의 시행(운영·설계·시공 부서 등) □ ‘26.06 : 154kV 나주S/S ESS 건설공사(일반) 발주 □ ‘26.07 : 154kV 나주S/S 56MW ESS 설치조건부(EPC) 자재구매 발주 □ ‘26.07 : 제어동 출입구 변경 관계자 회의 결과 보고 - 시공성, 경제성 및 적기준공 가능여부 등에 따라 제어동 출입문 추가 설치 결정 □ ‘26.07 : 154kV 나주S/S ESS 건설공사 책임감리 용역 발주 attachment_count 0 source_detail_sha256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231564|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e071beada30e0895
Sources EV-033a795b588f83480785099c Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb 행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_b13e1a5e6ce037f0 stable_project_key prjtDef:231564:ESB project_definition 231564 first_region_code ESB manual_source_format false project_name 154kV 나주S/S ESS 건설사업 project_name_list 154kV 나주변전소 ESS 건설사업 purpose 전력계통 불안정 해소를 위한 ESS설치 project_region_detail 전남광주통합특별시 나주시 project_period_raw 2021.03~2027.12 project_scale_raw 56MW ESS responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_b13e1a5e6ce037f0
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_b13e1a5e6ce037f0
Sources EV-c262722841fea18a1b66dd7f Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 bc4a7f978e56c110674e8c5da7c862a74eb8aa8c8ec2cd0b547b7f61d04dc4b9 Observations for this power asset History for this project