POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 28items · current page 1–28 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-c262722841fea18a1b66dd7f
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_b13e1a5e6ce037f0
stable_project_keyprjtDef:231564:ESB
project_definition231564
first_region_codeESB
manual_source_formatfalse
project_name154kV 나주S/S ESS 건설사업
project_name_list154kV 나주변전소 ESS 건설사업
purpose전력계통 불안정 해소를 위한 ESS설치
project_region_detail전남광주통합특별시 나주시
project_period_raw2021.03~2027.12
project_scale_raw56MW ESS
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e071beada30e0895
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_b13e1a5e6ce037f0

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_b13e1a5e6ce037f0

Sources EV-c262722841fea18a1b66dd7f
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 bc4a7f978e56c110674e8c5da7c862a74eb8aa8c8ec2cd0b547b7f61d04dc4b9
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2026-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-03
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source schedule candidates · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231564|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source snapshots by date · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_e071beada30e0895
stable_project_idkproj_b13e1a5e6ce037f0
source_key202609|231564|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 나주변전소 ESS 건설사업
project_name_detail154kV 나주S/S ESS 건설사업
region_summary_raw전남광주통합특별시 나주시등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 전력계통 불안정 해소를 위한 ESS설치
Project region
  • 전남광주통합특별시 나주시
Project period
  • 2021.03~2027.12
사업 규모
  • 56MW ESS
담당 사업소
  • 중부건설본부/직할
계획확정
  • 제10차 장기송변전설비계획 반영(2024.07)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
  • 2026.05
사업설계
  • 설계용역: 기본설계: 실시설계: 2026.02 ~ 2026.05 설계담당자: [redacted]
□ ‘21.03 : ESS 건설사업 기준 정립 T/F 회의 시행(송변전건설처) □ ‘21.12 : 예비타당성조사 탈락에 따른 ESS 건설사업 중단 □ ‘23.04 : 10차 장기 송변전계획 확정에 따른 사업 재개 □ ‘24.06 : 계통안정화 ESS 건설사업 사전준비 실무회의 □ ‘24.07 : ‘26~‘28년 계통안정화 ESS 건설사업 추진계획 공문 수신 □ ‘24.09 : 계통안정화 ESS 건설사업 사업수행 적정성 재검토 T/F 구성·운영 □ ‘25.05 : 사업관계자 현장회의 시행 □ ‘25.06 : 설비배치 관계자 회의 시행 □ ‘25.09 : 기본설계 심의위원회 개최 및 결과보고 □ ‘26.01 : 154kV 나주S/S ESS 건설사업 기기배치 관련 관계자 현장 회의시행 □ ‘26.02 : 154kV 나주S/S ESS 건설사업 기기배치 변경안 확정 □ ‘26.05 : 154kV 나주S/S ESS 제어동 구조 변경 요청(광주전남본부) □ ‘26.05 : 서안성S/S 자재 재활용 관련 회의 - 23kV GIS, 154kV M.Tr 신규 발주 - M.Tr 적기 수급불가 → 기발주분(광주전남) 선사용 □ ‘26.06 : 실시설계(안) 완료 □ ‘26.06 : 제어동 출입구 변경 관계자 회의 시행(운영·설계·시공 부서 등) □ ‘26.06 : 154kV 나주S/S ESS 건설공사(일반) 발주 □ ‘26.07 : 154kV 나주S/S 56MW ESS 설치조건부(EPC) 자재구매 발주 □ ‘26.07 : 제어동 출입구 변경 관계자 회의 결과 보고 - 시공성, 경제성 및 적기준공 가능여부 등에 따라 제어동 출입문 추가 설치 결정 □ ‘26.07 : 154kV 나주S/S ESS 건설공사 책임감리 용역 발주
future_plan_redacted□ 향후계획 □ ‘21.03 : ESS 건설사업 기준 정립 T/F 회의 시행(송변전건설처) □ ‘21.12 : 예비타당성조사 탈락에 따른 ESS 건설사업 중단 □ ‘23.04 : 10차 장기 송변전계획 확정에 따른 사업 재개 □ ‘24.06 : 계통안정화 ESS 건설사업 사전준비 실무회의 □ ‘24.07 : ‘26~‘28년 계통안정화 ESS 건설사업 추진계획 공문 수신 □ ‘24.09 : 계통안정화 ESS 건설사업 사업수행 적정성 재검토 T/F 구성·운영 □ ‘25.05 : 사업관계자 현장회의 시행 □ ‘25.06 : 설비배치 관계자 회의 시행 □ ‘25.09 : 기본설계 심의위원회 개최 및 결과보고 □ ‘26.01 : 154kV 나주S/S ESS 건설사업 기기배치 관련 관계자 현장 회의시행 □ ‘26.02 : 154kV 나주S/S ESS 건설사업 기기배치 변경안 확정 □ ‘26.05 : 154kV 나주S/S ESS 제어동 구조 변경 요청(광주전남본부) □ ‘26.05 : 서안성S/S 자재 재활용 관련 회의 - 23kV GIS, 154kV M.Tr 신규 발주 - M.Tr 적기 수급불가 → 기발주분(광주전남) 선사용 □ ‘26.06 : 실시설계(안) 완료 □ ‘26.06 : 제어동 출입구 변경 관계자 회의 시행(운영·설계·시공 부서 등) □ ‘26.06 : 154kV 나주S/S ESS 건설공사(일반) 발주 □ ‘26.07 : 154kV 나주S/S 56MW ESS 설치조건부(EPC) 자재구매 발주 □ ‘26.07 : 제어동 출입구 변경 관계자 회의 결과 보고 - 시공성, 경제성 및 적기준공 가능여부 등에 따라 제어동 출입문 추가 설치 결정 □ ‘26.07 : 154kV 나주S/S ESS 건설공사 책임감리 용역 발주
attachment_count0
source_detail_sha256906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231564|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e071beada30e0895

Sources EV-033a795b588f83480785099c
Evidence SHA-256 906ab44c091250bbd2e47b238235ad8d9ba2e66df975bc75b608bf72ea64cadb
행 SHA-256 4540fadacbf6facb3722d4201fd07515c040657a0a60aeba8949b5466c19487e
Source snapshots by date · KOR · kepco_planned

154kV 나주S/S ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_b13e1a5e6ce037f0
stable_project_keyprjtDef:231564:ESB
project_definition231564
first_region_codeESB
manual_source_formatfalse
project_name154kV 나주S/S ESS 건설사업
project_name_list154kV 나주변전소 ESS 건설사업
purpose전력계통 불안정 해소를 위한 ESS설치
project_region_detail전남광주통합특별시 나주시
project_period_raw2021.03~2027.12
project_scale_raw56MW ESS
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e071beada30e0895
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_b13e1a5e6ce037f0

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_b13e1a5e6ce037f0

Sources EV-c262722841fea18a1b66dd7f
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 bc4a7f978e56c110674e8c5da7c862a74eb8aa8c8ec2cd0b547b7f61d04dc4b9

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel