154kV 농생#2S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-9d8f1b57534a689fdd6cf229
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9bf6ba316748f558
stable_project_keyprjtDef:231718:ESB
project_definition231718
first_region_codeESB
manual_source_formatfalse
project_name154kV 농생#2S/S 건설사업
project_name_list154kV 농생#2S/S 건설사업
purpose새만금 농생명용지 신규부하 전력공급
project_region_detail전북특별자치도 부안군
project_period_raw2030.10~2032.10
project_scale_raw154KV 60MVA M.TR × 2BANK
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e34373ad67e5c8a0
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_9bf6ba316748f558

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9bf6ba316748f558

Sources EV-9d8f1b57534a689fdd6cf229
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 16608f33caf723b8f682f002f2ffdefef90de13d20b3afe045731868f9c53240
Source schedule candidates · KOR · kepco_planned

154kV 농생#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2032-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231718|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e34373ad67e5c8a0

Sources EV-82a3e82c3b17d234efda1989
Evidence SHA-256 e167378ec195ac6c970e8f4f079bfec2eab3ac276693236fa07298e0bc83db3e
행 SHA-256 06824d9c2b351462ce9d74266f39cb0cab573b4a93d87cf3bce3b9ad2b157ce1
Source schedule candidates · KOR · kepco_planned

154kV 농생#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2030-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231718|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e34373ad67e5c8a0

Sources EV-82a3e82c3b17d234efda1989
Evidence SHA-256 e167378ec195ac6c970e8f4f079bfec2eab3ac276693236fa07298e0bc83db3e
행 SHA-256 06824d9c2b351462ce9d74266f39cb0cab573b4a93d87cf3bce3b9ad2b157ce1
Source snapshots by date · KOR · kepco_planned

154kV 농생#2S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_e34373ad67e5c8a0
stable_project_idkproj_9bf6ba316748f558
source_key202609|231718|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 농생#2S/S 건설사업
project_name_detail154kV 농생#2S/S 건설사업
region_summary_raw전북특별자치도 부안군등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 새만금 농생명용지 신규부하 전력공급
Project region
  • 전북특별자치도 부안군
Project period
  • 2030.10~2032.10
사업 규모
  • 154KV 60MVA M.TR × 2BANK
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha256e167378ec195ac6c970e8f4f079bfec2eab3ac276693236fa07298e0bc83db3e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231718|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e34373ad67e5c8a0

Sources EV-82a3e82c3b17d234efda1989
Evidence SHA-256 e167378ec195ac6c970e8f4f079bfec2eab3ac276693236fa07298e0bc83db3e
행 SHA-256 06824d9c2b351462ce9d74266f39cb0cab573b4a93d87cf3bce3b9ad2b157ce1
Source snapshots by date · KOR · kepco_planned

154kV 농생#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9bf6ba316748f558
stable_project_keyprjtDef:231718:ESB
project_definition231718
first_region_codeESB
manual_source_formatfalse
project_name154kV 농생#2S/S 건설사업
project_name_list154kV 농생#2S/S 건설사업
purpose새만금 농생명용지 신규부하 전력공급
project_region_detail전북특별자치도 부안군
project_period_raw2030.10~2032.10
project_scale_raw154KV 60MVA M.TR × 2BANK
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e34373ad67e5c8a0
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_9bf6ba316748f558

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9bf6ba316748f558

Sources EV-9d8f1b57534a689fdd6cf229
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 16608f33caf723b8f682f002f2ffdefef90de13d20b3afe045731868f9c53240

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel