Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 농생#2S/S 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-9d8f1b57534a689fdd6cf229
Sources EV-82a3e82c3b17d234efda1989 Evidence SHA-256 e167378ec195ac6c970e8f4f079bfec2eab3ac276693236fa07298e0bc83db3e 행 SHA-256 06824d9c2b351462ce9d74266f39cb0cab573b4a93d87cf3bce3b9ad2b157ce1Source snapshots by date · KOR · kepco_planned
154kV 농생#2S/S 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_e34373ad67e5c8a0
stable_project_id
kproj_9bf6ba316748f558
source_key
202609|231718|ESB
basic_ym
202609
source_stage_raw
계획확정-사업승인전
project_name_list
154kV 농생#2S/S 건설사업
project_name_detail
154kV 농생#2S/S 건설사업
region_summary_raw
전북특별자치도 부안군등 1 지역
equipment_type_raw
변전
headquarters_raw
중부건설본부
office_raw
전북건설지사
section_fields
Project purpose
새만금 농생명용지 신규부하 전력공급
Project region
전북특별자치도 부안군
Project period
2030.10~2032.10
사업 규모
154KV 60MVA M.TR × 2BANK
담당 사업소
중부건설본부/전북건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-82a3e82c3b17d234efda1989 Evidence SHA-256 e167378ec195ac6c970e8f4f079bfec2eab3ac276693236fa07298e0bc83db3e 행 SHA-256 06824d9c2b351462ce9d74266f39cb0cab573b4a93d87cf3bce3b9ad2b157ce1Source snapshots by date · KOR · kepco_planned