Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 복정S/S 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-06d01d40e896351e9bccd23d
Sources EV-03bf73eaf11760762a20cd85 Evidence SHA-256 c26e1b5ccbda0ac8024885531e481bfd4de338ca5dd57477733056cafc994792 행 SHA-256 fb8ed1c31c3c308f9f274ab065ed6c1d2f9a87e8c8884504d5d5b7d85dba7ac6Source snapshots by date · KOR · kepco_planned
154kV 복정S/S 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_61c78d14627585fb
stable_project_id
kproj_8bf105957a2be437
source_key
202609|231185|ESB
basic_ym
202609
source_stage_raw
공사착수-사업완료전
project_name_list
154kV 복정S/S 건설사업
project_name_detail
154kV 복정S/S 건설사업
region_summary_raw
경기도 성남시 수정구등 1 지역
equipment_type_raw
변전
headquarters_raw
경인건설본부
office_raw
직할
section_fields
Project purpose
성남복정 신규부하 공급 및 인근변전소 부?
Project region
경기도 성남시 수정구
Project period
2008.06~2026.06
사업 규모
154/23KV 15/20MVA X 3대 2BANK
담당 사업소
경인건설본부/직할
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2021.11
Sources EV-03bf73eaf11760762a20cd85 Evidence SHA-256 c26e1b5ccbda0ac8024885531e481bfd4de338ca5dd57477733056cafc994792 행 SHA-256 fb8ed1c31c3c308f9f274ab065ed6c1d2f9a87e8c8884504d5d5b7d85dba7ac6Source snapshots by date · KOR · kepco_planned