Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Relationship status: Source-stated · contract applies to inherited subject Related record r1:power_source:681b9101206e:power_asset:1fdeebacf453 · Relationship evidence
contracted grid apparent power capacity · Batam data center · as published As-of date 2026-05-15 Sources EV-f0cbf01ed65a244c36d3c36a
Detailed source fields
Original source field
Published value or condition
Signing period
2025
Supply start date
Not obtained
Actual energization date
Not obtained
Capacity basis
apparent_power
Connection point
Not obtained
inherited_batch
AIDC-GLOBAL-20261005-DATA-R1-FIX1
eligible_for_exact_contract_mw
false
Verification status
primary_statement
Change type
enriched
Contracting parties
Name
Telkom group / NeutraDC
Role
customer_as_issuer_described
Organization ID
Not obtained
Verification status
name_in_primary_source_not_registry_verified
Name
PLN Batam
Role
electricity_supplier
Organization ID
Not obtained
Verification status
name_in_primary_source_not_registry_verified
Real electricity supply contract, but unit is apparent power MVA. Do not convert to MW without a documented power factor. The source names BTM-1 as first building; contract is campus-level. No power factor is supplied, so 90 MVA is not converted to MW. Issuer says first campus operational in 2026; this is not meter-level energization proof.