contracted grid apparent power capacity · Batam data center · as published 基准日期 2026-05-15 依据 EV-f0cbf01ed65a244c36d3c36a
原始来源详细字段
原始来源字段
公开数值或条件
签约期间
2025
供电开始日期
未获取
实际送电日期
未获取
容量口径
apparent_power
接入点
未获取
inherited_batch
AIDC-GLOBAL-20261005-DATA-R1-FIX1
eligible_for_exact_contract_mw
false
验证状态
primary_statement
变更类型
enriched
合同当事方
名称
Telkom group / NeutraDC
角色
customer_as_issuer_described
机构ID
未获取
验证状态
name_in_primary_source_not_registry_verified
名称
PLN Batam
角色
electricity_supplier
机构ID
未获取
验证状态
name_in_primary_source_not_registry_verified
Real electricity supply contract, but unit is apparent power MVA. Do not convert to MW without a documented power factor. The source names BTM-1 as first building; contract is campus-level. No power factor is supplied, so 90 MVA is not converted to MW. Issuer says first campus operational in 2026; this is not meter-level energization proof.