POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Talbot County Energy / 7

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)262 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-820e5e28dd330b04df2afd12
Net Summer Capacity (MW)241 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-820e5e28dd330b04df2afd12
Net Winter Capacity (MW)256 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-820e5e28dd330b04df2afd12
Detailed source fields
Original source fieldPublished value or condition
Entity ID13994
Entity NameOglethorpe Power Corporation
Plant ID7916
Plant NameTalbot County Energy
Google MapMap
Bing MapMap
Plant StateGA
CountyTalbot
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID7
Nameplate Capacity (MW)262
Net Summer Capacity (MW)241
Net Winter Capacity (MW)256
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Planned Operation Month1
Planned Operation Year2029
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude32.5892
Longitude-84.6917
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1839

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:131

Sources EV-c387b90147ad273e4d7cce5c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cae4ccfbf36230ed8cf7a0c92d9422eceb69e21f260c420cb306f7ef4ee895b0

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1839

Sources EV-820e5e28dd330b04df2afd12
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 058cdadd40f4b26ae982d80aa6afb041ff1493e70f0845456429284387adceb1

Usage terms US government public domain

Source snapshots by date · USA · eia860

Talbot County Energy / 7

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID13994
Utility NameOglethorpe Power Corporation
Plant Code7916
Plant NameTalbot County Energy
StateGA
CountyTalbot
Generator ID7
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)262
Nameplate Power Factor0.85
Summer Capacity (MW)241
Winter Capacity (MW)256
StatusP
Effective Month1
Effective Year2029
Current Month1
Current Year2029
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1NG
Energy Source 2DFO
Multiple Fuels?Y
Switch Between Oil and Natural Gas?Y
Cofire Fuels?N
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:131

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:131

Sources EV-c387b90147ad273e4d7cce5c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cae4ccfbf36230ed8cf7a0c92d9422eceb69e21f260c420cb306f7ef4ee895b0

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Talbot County Energy / 7

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID13994
Entity NameOglethorpe Power Corporation
Plant ID7916
Plant NameTalbot County Energy
Google MapMap
Bing MapMap
Plant StateGA
CountyTalbot
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID7
Nameplate Capacity (MW)262
Net Summer Capacity (MW)241
Net Winter Capacity (MW)256
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Planned Operation Month1
Planned Operation Year2029
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude32.5892
Longitude-84.6917
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:1839

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1839

Sources EV-820e5e28dd330b04df2afd12
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 058cdadd40f4b26ae982d80aa6afb041ff1493e70f0845456429284387adceb1

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel