这是保留各来源观测的部分收集资料。发电及接入登记容量与数据中心供电余量不同。计划日期和合同公告不代表实际送电或供电开始。
当前条件 3条 · 当前页 1–3 · 为来源记录数,并非独立设施数。
电力对象与项目 · USA · eia860mTalbot County Energy / 7
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|
| Nameplate Capacity (MW) | 262 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-820e5e28dd330b04df2afd12 |
| Net Summer Capacity (MW) | 241 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-820e5e28dd330b04df2afd12 |
| Net Winter Capacity (MW) | 256 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-820e5e28dd330b04df2afd12 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Entity ID | 13994 |
| Entity Name | Oglethorpe Power Corporation |
| Plant ID | 7916 |
| Plant Name | Talbot County Energy |
| Google Map | Map |
| Bing Map | Map |
| Plant State | GA |
| County | Talbot |
| Balancing Authority Code | SOCO |
| Sector | Electric Utility |
| Generator ID | 7 |
| Nameplate Capacity (MW) | 262 |
| Net Summer Capacity (MW) | 241 |
| Net Winter Capacity (MW) | 256 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 1 |
| Planned Operation Year | 2029 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 32.5892 |
| Longitude | -84.6917 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1839 |
上级设施或电厂记录
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
eia860 ↗数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:131
依据 EV-c387b90147ad273e4d7cce5c
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cae4ccfbf36230ed8cf7a0c92d9422eceb69e21f260c420cb306f7ef4ee895b0使用条件 US government public domain
eia860m ↗数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1839
依据 EV-820e5e28dd330b04df2afd12
资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 058cdadd40f4b26ae982d80aa6afb041ff1493e70f0845456429284387adceb1使用条件 US government public domain
来源各时点记录 · USA · eia860Talbot County Energy / 7
发电机 · 计划
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Utility ID | 13994 |
| Utility Name | Oglethorpe Power Corporation |
| Plant Code | 7916 |
| Plant Name | Talbot County Energy |
| State | GA |
| County | Talbot |
| Generator ID | 7 |
| Technology | Natural Gas Fired Combustion Turbine |
| Prime Mover | GT |
| Ownership | S |
| Duct Burners | X |
| Can Bypass Heat Recovery Steam Generator? | X |
| Nameplate Capacity (MW) | 262 |
| Nameplate Power Factor | 0.85 |
| Summer Capacity (MW) | 241 |
| Winter Capacity (MW) | 256 |
| Status | P |
| Effective Month | 1 |
| Effective Year | 2029 |
| Current Month | 1 |
| Current Year | 2029 |
| Sector Name | Electric Utility |
| Sector | 1 |
| Previously Canceled | N |
| Energy Source 1 | NG |
| Energy Source 2 | DFO |
| Multiple Fuels? | Y |
| Switch Between Oil and Natural Gas? | Y |
| Cofire Fuels? | N |
| 原文状态 | P |
| source_record_id | 3_1_Generator_Y2025.xlsx#Proposed:131 |
上级设施或电厂记录
没有单独的指标汇总,请查看原始来源详细字段。
原文、基准日期与核实日期 1条
eia860 ↗数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:131
依据 EV-c387b90147ad273e4d7cce5c
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cae4ccfbf36230ed8cf7a0c92d9422eceb69e21f260c420cb306f7ef4ee895b0使用条件 US government public domain
来源各时点记录 · USA · eia860mTalbot County Energy / 7
发电机 · 计划
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Entity ID | 13994 |
| Entity Name | Oglethorpe Power Corporation |
| Plant ID | 7916 |
| Plant Name | Talbot County Energy |
| Google Map | Map |
| Bing Map | Map |
| Plant State | GA |
| County | Talbot |
| Balancing Authority Code | SOCO |
| Sector | Electric Utility |
| Generator ID | 7 |
| Nameplate Capacity (MW) | 262 |
| Net Summer Capacity (MW) | 241 |
| Net Winter Capacity (MW) | 256 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 1 |
| Planned Operation Year | 2029 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 32.5892 |
| Longitude | -84.6917 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| source_record_id | Planned:1839 |
上级设施或电厂记录
没有单独的指标汇总,请查看原始来源详细字段。
原文、基准日期与核实日期 1条
eia860m ↗数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1839
依据 EV-820e5e28dd330b04df2afd12
资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c