POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Riverside BESS / ES1

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)5 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-3fff62f1473467d036489237
Net Summer Capacity (MW)5 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-3fff62f1473467d036489237
Net Winter Capacity (MW)5 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-3fff62f1473467d036489237
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID65126
Plant NameRiverside BESS
Google MapMap
Bing MapMap
Plant StateNC
CountyBuncombe
Balancing Authority CodeCPLW
SectorElectric Utility
Generator IDES1
Nameplate Capacity (MW)5
Net Summer Capacity (MW)5
Net Winter Capacity (MW)5
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Latitude35.642335
Longitude-82.5973
Original textCanceled or Postponed
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idCanceled or Postponed:1493

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:5600

Sources EV-9a774bcaa37c082ba391a217
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9666112b9e1afeea756ea0e46ebe19de3c7547a7171d2aca456c5db6118f2433

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:1493

Sources EV-3fff62f1473467d036489237
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e1f4edeac0ccd942dec02b2ffe057e3891e0e1210c2659ed661c0048d00e94df

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Riverside BESS / ES1

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID65126
Plant NameRiverside BESS
Google MapMap
Bing MapMap
Plant StateNC
CountyBuncombe
Balancing Authority CodeCPLW
SectorElectric Utility
Generator IDES1
Nameplate Capacity (MW)5
Net Summer Capacity (MW)5
Net Winter Capacity (MW)5
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Latitude35.642335
Longitude-82.5973
Original textCanceled or Postponed
source_record_idCanceled or Postponed:1493

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:1493

Sources EV-3fff62f1473467d036489237
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e1f4edeac0ccd942dec02b2ffe057e3891e0e1210c2659ed661c0048d00e94df

Usage terms US government public domain

Source snapshots by date · USA · eia860

Riverside BESS / ES1

Generator · Postponed

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID3046
Utility NameDuke Energy Progress - (NC)
Plant Code65126
Plant NameRiverside BESS
StateNC
CountyBuncombe
Generator IDES1
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)5
Summer Capacity (MW)5
Winter Capacity (MW)5
Uprate or Derate Completed During YearN
StatusIP
Synchronized to Transmission GridX
Sector NameElectric Utility
Sector1
Energy Source 1MWH
Original textIP
source_record_id3_1_Generator_Y2025.xlsx#Retired and Canceled:5600

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:5600

Sources EV-9a774bcaa37c082ba391a217
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9666112b9e1afeea756ea0e46ebe19de3c7547a7171d2aca456c5db6118f2433

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel