POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 2items · current page 1–2 · Source records, not unique facilities.

Power assets and projects · USA · eia860

Riverside BESS

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)22.86 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-3cb655387b3a81a6d592843f
Detailed source fields
Original source fieldPublished value or condition
Utility ID3046
Utility NameDuke Energy Progress - (NC)
Plant Code65126
Plant NameRiverside BESS
Street Address2115 Riverside Drive
CityAsheville
StateNC
Zip28804
CountyBuncombe
Latitude35.642335
Longitude-82.597303
NERC RegionSERC
Balancing Authority CodeCPLW
Balancing Authority NameDuke Energy Progress West
Primary Purpose (NAICS Code)22
Regulatory StatusRE
Sector1
Sector NameElectric Utility
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerDuke Energy Progress - (NC)
Transmission or Distribution System Owner ID3046
Transmission or Distribution System Owner StateNC
Grid Voltage (kV)22.86
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:12290

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:12290

Sources EV-3cb655387b3a81a6d592843f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 79d6b7d289cfd36ad85d2dc2a94743646007cf46eeea2aa3b954a5f922a79c99

Usage terms US government public domain

Source snapshots by date · USA · eia860

Riverside BESS

Power plant · Unverified

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID3046
Utility NameDuke Energy Progress - (NC)
Plant Code65126
Plant NameRiverside BESS
Street Address2115 Riverside Drive
CityAsheville
StateNC
Zip28804
CountyBuncombe
Latitude35.642335
Longitude-82.597303
NERC RegionSERC
Balancing Authority CodeCPLW
Balancing Authority NameDuke Energy Progress West
Primary Purpose (NAICS Code)22
Regulatory StatusRE
Sector1
Sector NameElectric Utility
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerDuke Energy Progress - (NC)
Transmission or Distribution System Owner ID3046
Transmission or Distribution System Owner StateNC
Grid Voltage (kV)22.86
Energy StorageN
source_record_id2___Plant_Y2025.xlsx#Plant:12290

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:12290

Sources EV-3cb655387b3a81a6d592843f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 79d6b7d289cfd36ad85d2dc2a94743646007cf46eeea2aa3b954a5f922a79c99

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel