Power assets and projects · USA · eia860m

ACCP NJ 1 / ACCP1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-26311c9945159c291e4a4949
Net Summer Capacity (MW)1.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-26311c9945159c291e4a4949
Net Winter Capacity (MW)1.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-26311c9945159c291e4a4949
DC Net Capacity (MW)1.5 MWdcOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-26311c9945159c291e4a4949
Detailed source fields
Original source fieldPublished value or condition
Entity ID56990
Entity NameNJR Clean Energy Ventures Corporation
Plant ID63198
Plant NameACCP NJ 1
Google MapMap
Bing MapMap
Plant StateNJ
CountySussex
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDACCP1
Nameplate Capacity (MW)1.2
Net Summer Capacity (MW)1.2
Net Winter Capacity (MW)1.2
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month9
Operating Year2020
Status(OP) Operating
DC Net Capacity (MW)1.5
Latitude40.92635
Longitude-74.67509
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:21525

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:21517

Sources EV-e328fdf2591e5592052cf3b2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2d9ac1c6a329791eb9feab92f345d57bf3d908ab8a4abfd971dd9acaaeb7f49c

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:21525

Sources EV-26311c9945159c291e4a4949
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0b8b4fb0f08f020dd922b415b3f48f42180e38e7a668ee8e2e995116e307baf5

Usage terms US government public domain

Source snapshots by date · USA · eia860

ACCP NJ 1 / ACCP1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID56990
Utility NameNJR Clean Energy Ventures Corporation
Plant Code63198
Plant NameACCP NJ 1
StateNJ
CountySussex
Generator IDACCP1
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipW
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)1.2
Summer Capacity (MW)1.2
Winter Capacity (MW)1.2
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month9
Operating Year2020
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1SUN
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:21517

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:21517

Sources EV-e328fdf2591e5592052cf3b2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2d9ac1c6a329791eb9feab92f345d57bf3d908ab8a4abfd971dd9acaaeb7f49c

Usage terms US government public domain

Source snapshots by date · USA · eia860m

ACCP NJ 1 / ACCP1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID56990
Entity NameNJR Clean Energy Ventures Corporation
Plant ID63198
Plant NameACCP NJ 1
Google MapMap
Bing MapMap
Plant StateNJ
CountySussex
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDACCP1
Nameplate Capacity (MW)1.2
Net Summer Capacity (MW)1.2
Net Winter Capacity (MW)1.2
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month9
Operating Year2020
Status(OP) Operating
DC Net Capacity (MW)1.5
Latitude40.92635
Longitude-74.67509
Original text(OP) Operating
source_record_idOperating:21525

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:21525

Sources EV-26311c9945159c291e4a4949
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0b8b4fb0f08f020dd922b415b3f48f42180e38e7a668ee8e2e995116e307baf5

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel