Power assets and projects · USA · eia860
ACCP NJ 1
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
12.47 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-b585b967a3a5eb2f2a43e77f
Detailed source fields
Original source field
Published value or condition
Utility ID
56990
Utility Name
NJR Clean Energy Ventures Corporation
Plant Code
63198
Plant Name
ACCP NJ 1
Street Address
Flora Rd.
City
Hopatcong
State
NJ
Zip
7843
County
Sussex
Latitude
40.92635
Longitude
-74.675089
NERC Region
RFC
Balancing Authority Code
PJM
Balancing Authority Name
PJM Interconnection, LLC
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
20-1244-000
FERC Exempt Wholesale Generator Status
N
Transmission or Distribution System Owner
Jersey Central Power & Lt Co
Transmission or Distribution System Owner ID
9726
Transmission or Distribution System Owner State
NJ
Grid Voltage (kV)
12.47
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:10516
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.