Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Twin Falls Hydro / UNI1
Generator · Operations
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
12 MW
Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-83e7cd49347f0a542a075b0e
Net Summer Capacity (MW)
11.4 MW
Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-83e7cd49347f0a542a075b0e
Net Winter Capacity (MW)
11 MW
Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-83e7cd49347f0a542a075b0e