POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Cherokee Dam / 4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)32.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-afee70dd5418f8ef78f65070
Net Summer Capacity (MW)25 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-afee70dd5418f8ef78f65070
Net Winter Capacity (MW)25 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-afee70dd5418f8ef78f65070
Detailed source fields
Original source fieldPublished value or condition
Entity ID18642
Entity NameTennessee Valley Authority
Plant ID3397
Plant NameCherokee Dam
Google MapMap
Bing MapMap
Plant StateTN
CountyJefferson
Balancing Authority CodeTVA
SectorElectric Utility
Generator ID4
Nameplate Capacity (MW)32.4
Net Summer Capacity (MW)25
Net Winter Capacity (MW)25
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month10
Operating Year1953
Status(OP) Operating
Latitude36.168176
Longitude-83.49768
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:4821

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4816

Sources EV-8a8f00182bd8f1a415d1d6ff
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e110ec2dc0f0f31eb6b121a72d3c1736b3e6e29b8c53c41c719bf4f884af6acb

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4821

Sources EV-afee70dd5418f8ef78f65070
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b4e09a2fed3a52d0ec5916d700afc061c553a8b1c3d19674e217d294457f3349

Usage terms US government public domain

Source snapshots by date · USA · eia860

Cherokee Dam / 4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID18642
Utility NameTennessee Valley Authority
Plant Code3397
Plant NameCherokee Dam
StateTN
CountyJefferson
Generator ID4
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)32.4
Nameplate Power Factor0.9
Summer Capacity (MW)25
Winter Capacity (MW)25
Minimum Load (MW)14.5
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month10
Operating Year1953
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load1H
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:4816

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4816

Sources EV-8a8f00182bd8f1a415d1d6ff
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e110ec2dc0f0f31eb6b121a72d3c1736b3e6e29b8c53c41c719bf4f884af6acb

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Cherokee Dam / 4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID18642
Entity NameTennessee Valley Authority
Plant ID3397
Plant NameCherokee Dam
Google MapMap
Bing MapMap
Plant StateTN
CountyJefferson
Balancing Authority CodeTVA
SectorElectric Utility
Generator ID4
Nameplate Capacity (MW)32.4
Net Summer Capacity (MW)25
Net Winter Capacity (MW)25
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month10
Operating Year1953
Status(OP) Operating
Latitude36.168176
Longitude-83.49768
Original text(OP) Operating
source_record_idOperating:4821

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4821

Sources EV-afee70dd5418f8ef78f65070
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b4e09a2fed3a52d0ec5916d700afc061c553a8b1c3d19674e217d294457f3349

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel