POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Dafter / 3C Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 2 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-1650a4a03be29f9aae08ba38 Net Summer Capacity (MW) 1.8 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-1650a4a03be29f9aae08ba38 Net Winter Capacity (MW) 1.8 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-1650a4a03be29f9aae08ba38
Detailed source fields Original source field Published value or condition Entity ID 3828 Entity Name Cloverland Electric Co-op Plant ID 1868 Plant Name Dafter Google Map Map Bing Map Map Plant State MI County Chippewa Balancing Authority Code MISO Sector Electric Utility Generator ID 3C Nameplate Capacity (MW) 2 Net Summer Capacity (MW) 1.8 Net Winter Capacity (MW) 1.8 Technology Petroleum Liquids Energy Source Code DFO Prime Mover Code IC Operating Month 12 Operating Year 2021 Status (OP) Operating Latitude 46.37437 Longitude -84.41723 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:2839
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:2832
Sources EV-3ffcd892fc6b3d3bfa556d57 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 fbea2c02574adc39b0358a65f087cc16169971838dcd9610d056f2e4bd22825d Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:2839
Sources EV-1650a4a03be29f9aae08ba38 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 8639cd95bef79fb0a0027c7e20f4acceeb97318f63ddd343414cd871532c4a06 Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860 Dafter / 3C Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 3828 Utility Name Cloverland Electric Co-op Plant Code 1868 Plant Name Dafter State MI County Chippewa Generator ID 3C Technology Petroleum Liquids Prime Mover IC Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X RTO/ISO LMP Node Designation MIUP.DFTR13N1 Nameplate Capacity (MW) 2 Nameplate Power Factor 0.9 Summer Capacity (MW) 1.8 Winter Capacity (MW) 1.8 Minimum Load (MW) 1.8 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 12 Operating Year 2021 Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 DFO Time from Cold Shutdown to Full Load 1H Multiple Fuels? N Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:2832
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:2832
Sources EV-3ffcd892fc6b3d3bfa556d57 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 fbea2c02574adc39b0358a65f087cc16169971838dcd9610d056f2e4bd22825d Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860m Dafter / 3C Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 3828 Entity Name Cloverland Electric Co-op Plant ID 1868 Plant Name Dafter Google Map Map Bing Map Map Plant State MI County Chippewa Balancing Authority Code MISO Sector Electric Utility Generator ID 3C Nameplate Capacity (MW) 2 Net Summer Capacity (MW) 1.8 Net Winter Capacity (MW) 1.8 Technology Petroleum Liquids Energy Source Code DFO Prime Mover Code IC Operating Month 12 Operating Year 2021 Status (OP) Operating Latitude 46.37437 Longitude -84.41723 Original text (OP) Operating source_record_id Operating:2839
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:2839
Sources EV-1650a4a03be29f9aae08ba38 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 8639cd95bef79fb0a0027c7e20f4acceeb97318f63ddd343414cd871532c4a06 Usage terms US government public domain
Observations for this power asset