Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Dafter
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
69 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-59df24c3a3953c362d5294f8
Detailed source fields
Original source field
Published value or condition
Utility ID
3828
Utility Name
Cloverland Electric Co-op
Plant Code
1868
Plant Name
Dafter
Street Address
2535 W M-28
City
Dafter
State
MI
Zip
49724
County
Chippewa
Latitude
46.37437
Longitude
-84.41723
NERC Region
RFC
Balancing Authority Code
MISO
Balancing Authority Name
Midcontinent Independent Transmission System Operator, Inc..
Name of Water Source
Wells
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
American Transmission Co
Transmission or Distribution System Owner ID
659
Transmission or Distribution System Owner State
WI
Grid Voltage (kV)
69
Energy Storage
N
Natural Gas Storage
X
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:972
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.