GLOBAL INFRASTRUCTURE
Global Data Center and Power Evidence Map
Explore facilities and public spatial data, and check the source of each location and figure.
The figures below count records per source. Different sources, buildings, campuses or service listings may refer to the same facility, so these are not added up as a worldwide facility total.
WRI power plants are historical records from the 2021 release. Added official records show each source's reference date. Generator coordinates may locate the plant. Generation MW, data-center incoming MW, IT MW, contracts, measured usage and current available capacity are separate measures.
Current filters 1items · current page 1–1 · map records across all results 1items
The atlas queries the entire public database; the ledger below is paginated. Records without coordinates remain in the list. Collection checked 2026-10-08
Network map of the entire database
OSM telecom lines join source segment endpoints and shared junctions with straight lines. Country and city diagrams from cable announcements are identified separately. Segments with the same name and operator share a color; select a line to view its source. These diagrams do not establish surveyed alignments, data center entry connections or available capacity.
Dashed center connections are scenarios drawn from public locations via nearby public telecom hubs. They do not confirm carrier connectivity, physical fiber or access contracts. Where the cable participant has no documented public hub, the diagram connects the landing area directly to the center.
Coverage and import status
Global facilities and telecom segments are loaded from the database alongside Korean power and telecom records and official cable announcements. Records without source coordinates are not assigned invented lines. This collection is not a complete global inventory.
WRI plants are historical records from the 2021 release. OSM labels do not establish current operation or official power supply. A data center directory listing alone does not establish operating status.
© OpenStreetMap contributors · ODbL-1.0. Download this map's connection data · Download global OSM-derived data
TeleGeography global submarine cable map ↗
Refresh reads completed database batches. It does not imply automatic external collection or worldwide real-time updates.
Records on this page
Published evidence of power contracts and capacity
Power supply, grid connection, PPA, IT capacity and lease contracts retain their original announcement bases. Current contract validity, energization and remaining capacity require separate verification. Records without a specified site are not linked to a mapped facility.
Unable to load power contract evidence.
Sources and terms of use
Map details show original sources, reference dates, checked dates and the scope of each figure. Operator announcements, public map objects and external candidates have distinct verification labels.
OpenStreetMap data: © OpenStreetMap contributors, ODbL. OSM points, boundaries and relations are separate source records, not deduplicated facilities or campuses. Wikidata structured data is CC0That is.
Download complete OSM derivative dataset · ODbL 1.0
Map objects' public licenses are distinguished from the disclosure scope of operator facts. They do not grant reuse rights for other sources' photos, descriptions or paid databases.
Initial recovered dataset coverage by source
These are the original dataset counts. They may differ from current public database counts after updates and duplicate linking.
WRI Global Power Plant Database
1.3.0 · Criteria 2021 · initially included 34,936items
Historical data based on the 2021 public release. Generating capacity is not data center utility supply capacity, IT capacity, contracted power capacity or available grid connection capacity. Current operating status and connection feasibility have not been verified.
Global Energy Observatory, Google, KTH Royal Institute of Technology in Stockholm, Enipedia, World Resources Institute. Global Power Plant Database, v1.3.0. CC BY 4.0. Normalized and filtered for this application; WRI does not endorse the application.
CC-BY-4.0AirTrunk Locations
2026-10-05 retrieval · Criteria not stated · initially included 22items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual code/city/country directory extraction onlyDigital Realty global data-center directory
2026-10-05 retrieval · Criteria not stated · initially included 261items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual identifier/location extraction onlyEquinix Colocation Availability
2026-10-05 retrieval · Criteria not stated · initially included 253items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual facility identifiers and metro/country extraction onlyNTT DATA Global Locations public map feed
2026-10-05 retrieval · Criteria not stated · initially included 13items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual title/country/coordinate extraction onlyFortum provides local hydropower to EcoDataCenter in Falun, Sweden
2026-10-05 retrieval · Criteria 2026-06-22 · initially included 1items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual observation and short evidence excerptTM Nxera secures 280MW to power AI-ready, green data centre campus in Johor
2026-10-05 retrieval · Criteria 2026-01-22 · initially included 1items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual observation and short evidence excerptIREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement
2026-10-05 retrieval · Criteria 2025-03-17 · initially included 1items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual observation and short evidence excerptApplied Blockchain S-1 Exhibit 10.6: Electric Service Agreement
2026-10-05 retrieval · Criteria 2021-08-13 · initially included 1items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual observation and short evidence excerptTNB-GDS Collaboration Signals Positive Growth in Foreign Investment for Malaysia Data Centre Market
2026-10-05 retrieval · Criteria 2023-03-26 · initially included 1items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual observation and short evidence excerptYondr Group powers up its first data center campus in Malaysia within two years of market entry
2026-10-05 retrieval · Criteria 2024-03-12 · initially included 1items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual observation and short evidence excerptPT Telekomunikasi Indonesia 2025 Form 20-F, page 79 (PDF page 82)
2026-10-05 retrieval · Criteria 2026-05-15 · initially included 1items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual observation and short evidence excerptCore Scientific Q4 FY2025 earnings presentation, slides 5, 12 and 16
2026-10-05 retrieval · Criteria 2026-03-02 · initially included 1items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual observation and short evidence excerptBitfarms Ltd. Form 10-K for year ended December 31, 2025
2026-10-05 retrieval · Criteria 2026-03-31 · initially included 1items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual observation and short evidence excerptTNB and Racks Central Sign Electricity Supply Agreement for Johor AI Data Center Campus
2026-10-05 retrieval · Criteria 2026-04-22 · initially included 1items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual observation and short evidence excerptHut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of $7.0 Billion
2026-10-05 retrieval · Criteria 2025-12-17 · initially included 1items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual observation and short evidence excerptIREN Limited Form 10-K for year ended June 30, 2025
2026-10-05 retrieval · Criteria 2025-08-28 · initially included 2items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual observation and short evidence excerptTalen Energy Expands Nuclear Energy Relationship with Amazon (8-K Exhibit 99.1)
2026-10-05 retrieval · Criteria 2025-06-11 · initially included 1items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual observation and short evidence excerptYondr Group achieves first completion milestone six months ahead of schedule at 98MW Johor data center
2026-10-05 retrieval · Criteria 2025-06-05 · initially included 1items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; factual observation and short evidence excerptSTT GDC Bangkok locations
2026-10-05 retrieval · Criteria not stated · initially included 3items
These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.
Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.
No open licence asserted; small factual sampleWikidata data-center coordinate query
2026-10-05 retrieval · Criteria not stated · initially included 83items
Candidates from external public sources; operating status and contracted capacity have not yet been verified.
Wikidata contributors, CC0
CC0-1.0 structured data only