GLOBAL INFRASTRUCTURE

Global Data Center and Power Evidence Map

Explore facilities and public spatial data, and check the source of each location and figure.

The figures below count records per source. Different sources, buildings, campuses or service listings may refer to the same facility, so these are not added up as a worldwide facility total.

WRI power plants are historical records from the 2021 release. Added official records show each source's reference date. Generator coordinates may locate the plant. Generation MW, data-center incoming MW, IT MW, contracts, measured usage and current available capacity are separate measures.

Current filters 567items · current page 1–200 · map records across all results 274items
The atlas queries the entire public database; the ledger below is paginated. Records without coordinates remain in the list. Collection checked 2026-10-08

Network map of the entire database

Loading database
Preparing the map.
Hover over or tap a line to see route information.
Operation announcedUnder constructionPermit and Licensing ProcessLicensing CompletePlanned / preconstructionSuspended / closedStage requires verification
How connections are drawn

OSM telecom lines join source segment endpoints and shared junctions with straight lines. Country and city diagrams from cable announcements are identified separately. Segments with the same name and operator share a color; select a line to view its source. These diagrams do not establish surveyed alignments, data center entry connections or available capacity.

Dashed center connections are scenarios drawn from public locations via nearby public telecom hubs. They do not confirm carrier connectivity, physical fiber or access contracts. Where the cable participant has no documented public hub, the diagram connects the landing area directly to the center.

Coverage and import status

Global facilities and telecom segments are loaded from the database alongside Korean power and telecom records and official cable announcements. Records without source coordinates are not assigned invented lines. This collection is not a complete global inventory.

WRI plants are historical records from the 2021 release. OSM labels do not establish current operation or official power supply. A data center directory listing alone does not establish operating status.

© OpenStreetMap contributors · ODbL-1.0. Download this map's connection data · Download global OSM-derived data

TeleGeography global submarine cable map ↗

Refresh reads completed database batches. It does not imply automatic external collection or worldwide real-time updates.

Compare global records 0/3Select records to compare from the list.

Records on this page

Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →
Record details →

Published evidence of power contracts and capacity

Power supply, grid connection, PPA, IT capacity and lease contracts retain their original announcement bases. Current contract validity, energization and remaining capacity require separate verification. Records without a specified site are not linked to a mapped facility.

Power evidence by source 19records — open
Country / project site / partiesAnnounced value and typeReference date / evidence
Indonesia
NeutraDC Nxera Batam hyperscale campus
NeutraDC Nxera Batam (Telkom / Singtel / Medco Power JV)
90 MVA
contracted grid apparent power capacity
Scope: check original source conditions
Conditions / interpretation limits

electrical support secured by contract with PLN Batam

Real electricity supply contract, but unit is apparent power MVA. Do not convert to MW without a documented power factor. The source names BTM-1 as first building; contract is campus-level.

2026-05-15
PT Telekomunikasi Indonesia 2025 Form 20-F, page 79 (PDF page 82)
Malaysia
TM Nxera Iskandar Puteri campus
TM Nxera (Telekom Malaysia / Singtel Nxera JV)
280 MW
contracted electricity supply capacity
Scope: check original source conditions
Conditions / interpretation limits

secured under a multi-year electricity supply agreement

Operator explicitly identifies TNB electricity-supply agreement and campus. Press release dateline is 2026-01-12; displayed publication date is 2026-01-22. Campus scalable capacity is separately described as more than 200MW. Do not confuse the two.

2026-01-22
TM Nxera secures 280MW to power AI-ready, green data centre campus in Johor
Malaysia
Site not specified
Bridge Data Centres
400 MW
contracted electricity supply capacity
Scope: check original source conditions
Conditions / interpretation limits

ESA signed in December 2024; individual campus not named on cited slide

Utility confirms 400MW ESA separately from 100MW renewable BESC. This primary slide does not name MY07, so facility and code remain null rather than importing a press/database mapping.

2025-03-03
TNB Analyst Briefing 4QFY2024, slide 17 (PDF page 21)
Malaysia
GDS Nusajaya Tech Park campus
GDS IDC Services (Malaysia)
85.5 MW
utility supply maximum demand
Scope: check original source conditions
Conditions / interpretation limits

maximum demand planned for delivery in 2023 under ESA collaboration

Primary utility announcement explicitly ties supply to October 2022 ESA, with 16MW interim supply. 85.5MW is described as maximum demand, not quoted as a contract ceiling. Preserve this distinction and historic as-of date.

2023-03-26
TNB-GDS Collaboration Signals Positive Growth in Foreign Investment for Malaysia Data Centre Market
Malaysia
Johor Sedenak Tech Park campus
Yondr
300 MW
critical it design capacity
Scope: check original source conditions
Conditions / interpretation limits

300MW+ IT load enabled by ESA; planned fully built campus

Announcement expressly describes IT load, despite being in an ESA paragraph. Contract gross/grid MW is not disclosed. Displayed date March 12; release dateline March 13, 2024.

2024-03-12
Yondr Group powers up its first data center campus in Malaysia within two years of market entry
Malaysia
First Johor data center on Sedenak campus
Yondr
98 MW
critical it design capacity
Scope: check original source conditions
Conditions / interpretation limits

full facility IT capacity; first 25MW handed over

Facility-level IT capacity within the separate 300MW IT campus. At announcement only first 25MW IT had been handed to client; do not present 98MW as fully live or as electricity contract.

2025-06-05
Yondr Group achieves first completion milestone six months ahead of schedule at 98MW Johor data center
Malaysia
AirTrunk JHB1, Johor Bahru
AirTrunk
30 MW
generation virtual ppa capacity
Scope: check original source conditions
Conditions / interpretation limits

renewable virtual power purchase agreement with ib vogt

Generation procurement/virtual PPA under Corporate Green Power Programme. Not grid connection capacity. Announcement separately calls JHB1 a 150MW facility and initial phases over 50MW. Page also displays later update date December 19, 2024.

2024-07-30
AirTrunk opens AI-ready data centre in Malaysia, accelerating innovation and the energy transition
Malaysia
Johor AI data center campus, first phase
Racks Central
100 MW
facility capacity unspecified
Scope: check original source conditions
Conditions / interpretation limits

first phase supported by signed ESA; power basis unspecified

ESA existence is confirmed, but 100MW modifies phase capacity rather than an explicit electricity-supply amount; IT versus gross basis is unspecified. Conservatively exclude from exact contract MW.

2026-04-22
TNB and Racks Central Sign Electricity Supply Agreement for Johor AI Data Center Campus
Malaysia
Site not specified
Bridge Data Centres
100 MW
renewable bilateral supply capacity
Scope: check original source conditions
Conditions / interpretation limits

BESC renewable supply under CRESS; campus scope not stated

Separate green supply contract from 400MW grid ESA in same slide. These figures are not additive site capacity. Individual campus not named in primary slide.

2025-03-03
TNB Analyst Briefing 4QFY2024, slide 17 (PDF page 21)
Sweden
Falun data center
EcoDataCenter
10 MW
generation ppa physical supply capacity
Scope: check original source conditions
Conditions / interpretation limits

five-year local hydropower supply capacity, January 2026 through December 2030

Explicit physical generation-linked supply contract from nearby Dalälven plants; Fortum also assumes physical-supply and balance responsibility. 10MW covers a share of energy needs, not campus grid connection capacity or total IT load.

2026-06-22
Fortum provides local hydropower to EcoDataCenter in Falun, Sweden
United States
Jamestown blockchain facility (Fried Township, Stutsman County, North Dakota)
APLD Hosting LLC / Applied Digital
100 MW
contracted electricity supply capacity
Scope: check original source conditions
Conditions / interpretation limits

electric service capacity; interruptible, with 5MW firm demand level

Historic filed contract; supplier name redacted. Agreement clauses explicitly cover 100MW capacity, interruptible service, conditions precedent, five-year initial term and annual continuation. This is not 100MW firm supply and does not establish 2026 contract status. Source date is S-1 filing date. Signature block gives effective date August 4, 2021.

2021-08-13
Applied Blockchain S-1 Exhibit 10.6: Electric Service Agreement
United States
Panther Creek HPC data center campus, Pennsylvania
Bitfarms Ltd. (operator as named in filing)
350 MW
contracted electricity supply capacity
Scope: check original source conditions
Conditions / interpretation limits

contracted grid growth capacity under executed PPL ESA

The filing distinguishes contracted growth from additional potential capacity. Do not add historic on-site generation/import capacity to this figure without checking overlap. Contract entered October 2025 per Q3 2025 MDA; 50MW expected end-2026 and 300MW end-2027.

2026-03-31
Bitfarms Ltd. Form 10-K for year ended December 31, 2025
United States
Childress campus, Texas
IREN
750 MW
contracted grid connection capacity
Scope: check original source conditions
Conditions / interpretation limits

site grid capacity with executed grid connection agreement

Filing states all three Texas sites have executed grid connection agreements. 750MW is grid/site capacity; the same source reports only 650MW operating data-center capacity at June 30, 2025. Do not equate with IT load.

2025-08-28
IREN Limited Form 10-K for year ended June 30, 2025
United States
Sweetwater 1 campus, Texas
IREN
1400 MW
contracted grid connection capacity
Scope: check original source conditions
Conditions / interpretation limits

site grid capacity under executed connection agreement; full buildout conditional

2025 filing documents executed grid connection agreements and connection deposits. A 2026-09-08 operator update says Sweetwater substation is energized, 300MW gross construction targets Q4 2027, and ERCOT Batch Zero classifications remain conditional. This is not 1,400MW operational IT load.

2025-08-28
IREN Limited Form 10-K for year ended June 30, 2025
United States
Sweetwater 2 campus, Texas
IREN
600 MW
contracted grid connection capacity
Scope: check original source conditions
Conditions / interpretation limits

binding grid connection agreement; originally targeted late-2027 energization

Signed connection capacity is explicit. A 2026-09-08 operator update says the two Sweetwater campuses are conditionally included in ERCOT Batch Zero as Base Load, with ongoing approvals. Contract existence does not prove current unrestricted delivery.

2025-03-17
IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement
United States
AWS Susquehanna-adjacent campus and other Pennsylvania sites
Amazon Web Services
1920 MW
generation ppa capacity
Scope: regional portfolio covering multiple sites
Conditions / interpretation limits

full PPA quantity; ramp by no later than 2032; contract through 2042

Regional nuclear-generation procurement, with ability to deliver beyond Susquehanna-adjacent campus. Do not assign 1,920MW as a single facility grid limit, IT load, or immediate operating draw.

2025-06-11
Talen Energy Expands Nuclear Energy Relationship with Amazon (8-K Exhibit 99.1)
United States
Denton data center, Texas
Core Scientific
260 MW
leased customer it capacity
Scope: check original source conditions
Conditions / interpretation limits

approximately; customer-leased power under CoreWeave contracts

Deck defines customer power as non-redundant IT load and leased power as executed customer commitments regardless of service commencement. This is a colocation customer contract, not a utility power-supply contract. Five-site total ~590MW is separate from ~800MW gross.

2026-03-02
Core Scientific Q4 FY2025 earnings presentation, slides 5, 12 and 16
United States
River Bend AI data center campus, Louisiana
Hut 8
245 MW
leased customer it capacity
Scope: check original source conditions
Conditions / interpretation limits

15-year IT lease

Explicitly IT lease capacity, not utility supply contracted MW. Source identifies Google financial backstop; tenant relationship does not make Google facility operator.

2025-12-17
Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of $7.0 Billion
United States
River Bend AI data center campus, Louisiana
Hut 8
330 MW
utility capacity disclosed
Scope: check original source conditions
Conditions / interpretation limits

disclosed utility capacity supporting 245MW commercialized IT

Undated operator project page, retrieved October 5, 2026. Page also lists up to 1,000MW potential expansion; potential expansion is not contracted or operational capacity. No executed power-contract amount established by this page.


River Bend data center campus

Sources and terms of use

Map details show original sources, reference dates, checked dates and the scope of each figure. Operator announcements, public map objects and external candidates have distinct verification labels.

OpenStreetMap data: © OpenStreetMap contributors, ODbL. OSM points, boundaries and relations are separate source records, not deduplicated facilities or campuses. Wikidata structured data is CC0That is.

Download complete OSM derivative dataset · ODbL 1.0

Map objects' public licenses are distinguished from the disclosure scope of operator facts. They do not grant reuse rights for other sources' photos, descriptions or paid databases.

Initial recovered dataset coverage by source

These are the original dataset counts. They may differ from current public database counts after updates and duplicate linking.

WRI Global Power Plant Database

1.3.0 · Criteria 2021 · initially included 34,936items

Historical data based on the 2021 public release. Generating capacity is not data center utility supply capacity, IT capacity, contracted power capacity or available grid connection capacity. Current operating status and connection feasibility have not been verified.

Global Energy Observatory, Google, KTH Royal Institute of Technology in Stockholm, Enipedia, World Resources Institute. Global Power Plant Database, v1.3.0. CC BY 4.0. Normalized and filtered for this application; WRI does not endorse the application.

CC-BY-4.0

Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of $7.0 Billion

2026-10-05 retrieval · Criteria 2025-12-17 · initially included 1items

These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.

Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.

No open licence asserted; factual observation and short evidence excerpt

STT GDC Bangkok locations

2026-10-05 retrieval · Criteria not stated · initially included 3items

These materials reflect the time of the original publication. Current operating status and remaining capacity require separate verification.

Factual identifiers, locations and disclosed quantities only. AIDC independent normalization; no endorsement.

No open licence asserted; small factual sample