River Bend AI data center campus, Louisiana
data center project · Published statement
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| utility_capacity_disclosed | 330 MW | utility capacity disclosed · Campus · as published As-of date 2025-12-17 Sources EV-d17e9f046b869f6e9e6b63a2 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| collection_field_gaps |
|
| source_record_id | r1:power_source:a4f79053dc0a:power_asset:09ebf4d2d031 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 3items
Data Source 2025-12-17 · Retrieved 2026-10-05
www.hut8.com
Source location inherited observation P016
Sources EV-978f8daa1ed42f8e2188ea70Evidence SHA-256 e7a9b3a8388bff625ce18fdc4f11e3947189326d939e8765ba6b5c723b138bed · raw_http_response
Data Source 2025-12-17 · Retrieved 2026-10-05
www.hut8.com
Source location inherited observation P017
Sources EV-b43f557b099d61ea9386a89bEvidence SHA-256 1570c21e1ed5b0ce4f1633d8acdb8d69e28a60ca145771c49f5f809f5f3183fc · raw_http_response
Data Source 2025-12-17 · Retrieved 2026-10-05
www.hut8.com
Source location article body
Sources EV-d17e9f046b869f6e9e6b63a2Evidence SHA-256 1570c21e1ed5b0ce4f1633d8acdb8d69e28a60ca145771c49f5f809f5f3183fc · raw_http_response
