Indonesia · Announced development projects

NeutraDC Nxera Batam hyperscale campus

공식 원천의 전력 객체 · Published statement

Project stage · source basis
Stage requires verification · publisher_statement
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-05-15
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · IDN · primary:681b9101206ee05b9b5fa7d3

NeutraDC Nxera Batam hyperscale campus

data center project · Published statement

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
collection_field_gaps
  • fields
    • wue
    • water_supply_capacity
    • exact_connection_point
    • actual_energization_date
    reason
    No verified field-level original acquired for these attributes; null is not zero.
source_record_idr1:power_source:681b9101206e:power_asset:1fdeebacf453

No separate metric summary is available. Consult the detailed source fields.

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
www.telkom.co.id ↗

Data Source 2026-05-15 · Retrieved 2026-10-05

www.telkom.co.id

Source location inherited observation P009

Sources EV-f0cbf01ed65a244c36d3c36a
Evidence SHA-256 df3c0e05c2b97498c5468526b0bfb5ddfeb3ccfb85030cfd7ed4251810abaf7c · raw_http_response

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel